Welcome to Building Design+Construction’s 2024 Healthcare Annual Report. This 66-page special report is our first-ever “state of the state” update on the $65 billion healthcare construction sector.
The the report, which is available both as a free digital magazine and a free PDF download (short registration is required for both), the editors:
- highlight our top-10 trends in three key healthcare subsectors (hospitals, outpatient facilities, and behavioral health centers)
- present the findings of our exclusive outpatient facility survey
- provide a 2024-2025 outlook for the healthcare construction sector
- offer a roundup of market innovations for 2024, and
- outline innovations and trends related to products, materials, assemblies, and building systems for the healthcare building sector in an AIA-accredited course.
TABLE OF CONTENTS
MEET THE EXPERTS
Page 4
The BD+C editors connected with nearly 160 healthcare market firms and organizations for this report. Meet our contributors and sponsors.
SECTION 1 - 2024-25 HEALTHCARE CONSTRUCTION OUTLOOK
Page 6
Tracking the current and future states of the $65 billion healthcare market: hospitals, outpatient facilities, specialty medical buildings, and medical office buildings.
SECTION 2 - HEALTHCARE SUBSECTOR TRENDS
Page 14
Top 10 Trends in the Hospital Facilities Market
Raising the experience bar for patients, families, and staff is the focus of newer projects.
Page 26
Top 10 Trends in the Outpatient Facilities
Market Hospital systems and healthcare investors are reaching out with auxiliary medical facilities to capture patient market share.
Page 33
Top 10 Trends in the Behavioral Facilities Market
As accessibility and acceptance improve, the emphasis on crafting meaningful behavioral health spaces is becoming a higher priority for many in the AEC industry.
SECTION 3 - EXCLUSIVE RESEARCH
Page 40
MOB/Outpatient Facilities: Healthcare’s New Frontier
More than 130 healthcare experts share their thoughts on trends, innovations, and opportunities in the $18.3 billion outpatient facilities market.
SECTION 4 - INNOVATIONS ROUNDUP
Page 44
2024: A Year of Innovation in the Healthcare Market
We present a roundup of our favorite healthcare market innovations for 2024.
SECTION 5 - AIA CONTINUING EDUCATION COURSE
Page 57
With Intention and Innovation, Building Teams Boost Healthcare Efficacy
This AIA-accredited course worth 1.0 AIA HSW covers innovations and trends related to products, materials, assemblies, and building systems for the U.S. healthcare building sector.
Related Stories
| Aug 11, 2010
San Bernardino health center doubles in size
Temecula, Calif.-based EDGE was awarded the contract for California State University San Bernardino's health center renovation and expansion. The two-phase, $4 million project was designed by RSK Associates, San Francisco, and includes an 11,000-sf, tilt-up concrete expansion—which doubles the size of the facility—and site and infrastructure work.
| Aug 11, 2010
New hospital expands Idaho healthcare options
Ascension Group Architects, Arlington, Texas, is designing a $150 million replacement hospital for Portneuf Medical Center in Pocatello, Idaho. An existing facility will be renovated as part of the project. The new six-story, 320-000-sf complex will house 187 beds, along with an intensive care unit, a cardiovascular care unit, pediatrics, psychiatry, surgical suites, rehabilitation clinic, and ...
| Aug 11, 2010
Manhattan's Gouverneur Healthcare Services tops out renovation, expansion
One year after breaking ground, the Building Team for the renovation and expansion of the Gouverneur Healthcare Services facility on Manhattan's Lower East Side topped out the $180 million project. Designed by New York-based RMJM, the development involves a 316,000-sf renovation and 108,000-sf addition that will house a 295-bed nursing facility and five-story ambulatory care center.
| Aug 11, 2010
Decline expected as healthcare slows, but hospital work will remain steady
The once steady 10% growth rate in healthcare construction spending has slowed, but hasn't entirely stopped. Spending is currently 1.7% higher than the same time last year when construction materials costs were 8% higher. The 2.5% monthly jobsite spending decline since last fall is consistent with the decline in materials costs.
| Aug 11, 2010
Construction under way on LEED Platinum DOE energy lab
Centennial, Colo.-based Haselden Construction has topped out the $64 million Research Support Facilities, located on the U.S. Department of Energy’s National Renewable Energy Laboratory (NREL) campus in Golden, Colo. Designed by RNL and Stantec to achieve LEED Platinum certification and net zero energy performance, the 218,000-sf facility will feature natural ventilation through operable ...
| Aug 11, 2010
Stimulus funding helps get NOAA project off the ground
The award-winning design for the National Oceanic and Atmospheric Administration’s new Southwest Fisheries Science Center replacement laboratory saw its first sign of movement last month with a groundbreaking ceremony held in La Jolla, Calif. The $102 million project is funded primarily by the American Recovery and Reinvestment Act.
| Aug 11, 2010
National Intrepid Center tops out at Walter Reed
SmithGroup, Turner Construction, and the Intrepid Fallen Heroes Fund (IFHF), a nonprofit organization supporting the men and women of the United States Armed Forces and their families, celebrated the overall structural completion of the National Intrepid Center of Excellence (NICoE), an advanced facility dedicated to research, diagnosis, and treatment of military personnel and veterans sufferin...
| Aug 11, 2010
Alabama hospital gets a four-story addition
Birmingham, Ala.-based Hoar Construction has completed the North Tower addition at Thomas Hospital in Fairhope, Ala. The four-story, 123,000-sf addition accommodates an ER on the first floor, 32 private patient rooms and nursing support on the second and third floors, and room for 32 planned patient rooms on the top floor.
| Aug 11, 2010
America's Greenest Hospital
Hospitals are energy gluttons. With 24/7/365 operating schedules and stringent requirements for air quality in ORs and other clinical areas, an acute-care hospital will gobble up about twice the energy per square foot of, say, a commercial office building. It is an achievement worth noting, therefore, when a major hospital achieves LEED Platinum status, especially when that hospital attains 14 ...
| Aug 11, 2010
Hospital Additions + Renovations: 14 Lessons from Expert Building Teams
Two additions to a community hospital in Ohio that will double its square footage. A 12-story addition on top of an existing 12-story tower at Houston's M.D. Anderson Cancer Center. A $54 million renovation and addition at the University of Virginia Medical Center. A 67-bed, $70 million addition/renovation to a community hospital that is only five years old.