Gensler, AECOM, and Turner Construction top BD+C's rankings of the nation's largest university sector architecture, engineering, and construction firms, as reported in the 2020 Giants 400 Report.
Top 155 University Sector Architecture and AE Firms for 2020 | ||
FIRM | 2019 REVENUE | |
1 | Gensler | $80,513,358 |
2 | CannonDesign | $70,000,000 |
3 | SmithGroup | $46,863,030 |
4 | Perkins and Will | $37,619,650 |
5 | Stantec | $36,028,229 |
6 | EYP Architecture & Engineering | $29,149,414 |
7 | HMC Architects | $26,412,198 |
8 | Page | $25,000,000 |
9 | Perkins Eastman | $23,314,200 |
10 | S/L/A/M Collaborative, The | $22,007,000 |
11 | Flad Architects | $20,580,000 |
12 | DLR Group | $19,570,000 |
13 | Skidmore, Owings & Merrill | $18,700,716 |
14 | Mithun | $16,244,121 |
15 | Ballinger | $15,303,355 |
16 | Clark Nexsen | $14,412,000 |
17 | NBBJ | $13,700,000 |
18 | Moseley Architects | $13,363,328 |
19 | Ayers Saint Gross | $12,531,195 |
20 | EXP | $12,522,864 |
21 | ZGF Architects | $11,421,847 |
22 | LMN Architects | $11,292,500 |
23 | Shepley Bulfinch | $11,267,230 |
24 | LPA | $9,477,852 |
25 | RDG Planning & Design | $9,298,243 |
26 | LS3P | $9,287,190 |
27 | HED | $9,000,000 |
28 | Hord Coplan Macht | $8,628,290 |
29 | Huitt-Zollars | $8,524,000 |
30 | Kirksey Architecture | $8,284,729 |
31 | BHDP Architecture | $8,277,079 |
32 | Leo A Daly | $7,875,026 |
33 | Solomon Cordwell Buenz (SCB) | $7,828,890 |
34 | Diamond Schmitt Architects | $7,194,956 |
35 | Davis Brody Bond | $7,168,377 |
36 | Sasaki | $7,112,077 |
37 | Goodwyn, Mills and Cawood | $7,049,397 |
38 | Hastings+Chivetta Architects | $6,681,246 |
39 | Niles Bolton Associates | $6,663,255 |
40 | HDR | $6,431,488 |
41 | Ratio Architects | $6,302,350 |
42 | Moody Nolan | $6,210,700 |
43 | HOK | $6,003,000 |
44 | PBK | $5,900,000 |
45 | HGA | $5,677,017 |
46 | Harvard Jolly Architecture | $5,253,319 |
47 | Carrier Johnson + Culture | $5,213,779 |
48 | HLW | $5,100,000 |
49 | Quinn Evans | $5,059,504 |
50 | Little Diversified Architectural Consulting | $4,819,227 |
51 | FXCollaborative | $4,760,457 |
52 | Kahler Slater | $4,425,491 |
53 | CO Architects | $4,399,800 |
54 | GBBN | $4,305,000 |
55 | TreanorHL | $4,100,000 |
56 | PGAL | $4,013,000 |
57 | CPL | $4,004,401 |
58 | Baskervill | $3,932,934 |
59 | Legat Architects | $3,919,000 |
60 | Ashley McGraw Architects | $3,641,278 |
61 | Ennead Architects | $3,638,570 |
62 | BSA LifeStructures | $3,606,429 |
63 | GWWO Architects | $3,534,695 |
64 | Champlin Architecture | $3,518,354 |
65 | Huckabee | $3,388,362 |
66 | Cooper Carry | $3,337,436 |
67 | Whitman Requardt and Associates | $3,070,553 |
68 | Nelson Worldwide | $3,000,000 |
69 | Grimm + Parker Architects | $2,687,444 |
70 | Ratcliff | $2,621,000 |
71 | NAC Architecture | $2,360,146 |
72 | JLG Architects | $2,357,170 |
73 | BWBR | $2,319,000 |
74 | EwingCole | $2,300,000 |
75 | Finegold Alexander Architects | $2,235,635 |
76 | Zyscovich Architects | $2,229,543 |
77 | Spiezle Group | $2,220,000 |
78 | SWBR Architecture, Engineering & Landscape Architecture | $2,090,724 |
79 | JCJ Architecture | $2,090,568 |
80 | Lawrence Group | $2,023,300 |
81 | FGM Architects | $2,014,078 |
82 | Corgan | $1,738,150 |
83 | TETER | $1,712,262 |
84 | Bostwick Design Partnership | $1,600,000 |
85 | Urbahn Architects | $1,581,211 |
86 | GMB Architecture + Engineering | $1,576,148 |
87 | CBT | $1,504,079 |
88 | Orcutt | Winslow | $1,500,000 |
89 | ThenDesign Architecture | $1,500,000 |
90 | Clark Enersen Partners, The | $1,451,295 |
91 | SchraderGroup | $1,372,689 |
92 | Wendel | $1,336,012 |
93 | HuntonBrady Architects | $1,258,816 |
94 | Dattner Architects | $1,253,109 |
95 | DLZ Corporation | $1,236,000 |
96 | Design Collaborative | $1,204,675 |
97 | Emersion Design | $1,178,010 |
98 | Prellwitz Chilinski Associates (PCA) | $1,132,067 |
99 | CSArch | $1,117,543 |
100 | SchenkelShultz Architecture | $1,035,127 |
101 | Progressive AE | $1,014,211 |
102 | Stevens & Wilkinson | $956,000 |
103 | ACAI Associates | $952,641 |
104 | Ayres | $930,000 |
105 | Alliiance | $908,400 |
106 | BLT Architects | $889,973 |
107 | Fennick McCredie Architecture | $871,394 |
108 | Cuningham Group Architecture | $836,349 |
109 | Miller Dunwiddie | $812,600 |
110 | RSP Architects | $807,000 |
111 | YGH Architecture | $764,257 |
112 | BLDD Architects | $752,000 |
113 | HBG Design | $652,000 |
114 | RBB Architects | $600,000 |
115 | M+A Architects | $588,365 |
116 | Holst Architecture | $544,064 |
117 | JRS Architect | $500,000 |
118 | Wold Architects and Engineers | $500,000 |
119 | Bergmann | $500,000 |
120 | SHP | $500,000 |
121 | Ware Malcomb | $492,406 |
122 | VMDO Architects | $477,000 |
123 | Caldwell Associates Architects | $445,535 |
124 | Dyer Brown Architects | $406,055 |
125 | Architectural Resources Cambridge (ARC) | $374,754 |
126 | AHL | $356,359 |
127 | Eppstein Uhen Architects (EUA) | $352,000 |
128 | Hussey Gay Bell | $348,983 |
129 | Fanning Howey Associates | $323,861 |
130 | GSB | $279,100 |
131 | G70 | $261,000 |
132 | GRW | $255,175 |
133 | BCA Architects & Engineers | $250,000 |
134 | Hoefer Wysocki | $222,000 |
135 | SGA|NarmourWright Design | $211,130 |
136 | Hollis + Miller Architects | $206,960 |
137 | Garmann/Miller Architects-Engineers | $182,076 |
138 | WLC Architects | $180,496 |
139 | HMFH Architects | $160,005 |
140 | Blair + Mui Dowd Architects | $160,000 |
141 | REES | $138,230 |
142 | GFF | $130,270 |
143 | CTA Architects | $129,813 |
144 | SEI Design Group Architects | $123,466 |
145 | H2M Architects + Engineers | $106,113 |
146 | Adrian Smith + Gordon Gill Architecture | $98,340 |
147 | GreenbergFarrow | $68,808 |
148 | Crawford Architects | $63,900 |
149 | Smallwood | $57,845 |
150 | FCA | $46,147 |
151 | TEG Architects | $38,793 |
152 | Populous | $12,313 |
153 | Method Architecture | $12,285 |
154 | AE Design Group | $12,250 |
155 | RDC / Studio One Eleven | $11,188 |
156 | Line Scale Form Architects | $2,850 |
Top 80 University Sector Engineering and EA Firms for 2020 | ||
FIRM | 2019 REVENUE | |
1 | AECOM | $129,300,000 |
2 | Jacobs | $50,820,000 |
3 | Arup | $30,293,678 |
4 | NV5 Global | $22,957,000 |
5 | IMEG Corp. | $20,418,176 |
6 | P2S | $19,764,780 |
7 | WSP | $19,570,551 |
8 | Affiliated Engineers | $18,719,922 |
9 | RMF Engineering | $16,500,000 |
10 | Vanderweil Engineers | $16,102,800 |
11 | Dewberry | $13,899,311 |
12 | KPFF Consulting Engineers | $11,877,000 |
13 | Burns & McDonnell | $9,990,039 |
14 | Thornton Tomasetti | $9,958,258 |
15 | HEAPY | $8,076,453 |
16 | Walter P Moore | $7,574,985 |
17 | Wiley|Wilson | $7,095,900 |
18 | Bernhard | $5,560,000 |
19 | M/E Engineering | $5,170,914 |
20 | Ross & Baruzzini | $4,970,000 |
21 | Karpinski Engineering | $4,930,884 |
22 | Salas O'Brien | $4,912,492 |
23 | ME Engineers | $4,580,000 |
24 | Syska Hennessy Group | $4,235,847 |
25 | Jensen Hughes | $4,005,350 |
26 | CDM Smith | $3,807,049 |
27 | Martin/Martin | $3,687,132 |
28 | Newcomb & Boyd | $3,551,394 |
29 | Shive-Hattery | $3,551,001 |
30 | Jaros, Baum & Bolles | $3,459,451 |
31 | LaBella Associates | $3,299,663 |
32 | H.F. Lenz | $3,110,250 |
33 | TLC Engineering Solutions | $3,105,229 |
34 | Spectrum Engineers | $3,076,209 |
35 | Dunham Associates | $3,000,000 |
36 | Cushing Terrell (formerly CTA Architects Engineers) | $2,799,933 |
37 | Morrison Hershfield | $2,746,826 |
38 | Mazzetti | $2,605,340 |
39 | JQ Engineering | $2,580,336 |
40 | Peter Basso Associates | $2,300,000 |
41 | RTM Engineering Consultants | $2,148,859 |
42 | Architectural Engineers Inc. | $2,119,127 |
43 | SSOE Group | $2,088,842 |
44 | Henderson Engineers | $2,085,594 |
45 | AKF Group | $2,060,000 |
46 | Bala Consulting Engineers | $1,818,000 |
47 | Kohler Ronan | $1,723,695 |
48 | Bridgers & Paxton Consulting Engineers | $1,704,093 |
49 | KZF Design | $1,579,085 |
50 | LBYD Engineers | $1,570,724 |
51 | French & Parrello Associates | $1,395,576 |
52 | RMH Group, The | $1,205,511 |
53 | Woolpert | $1,118,848 |
54 | RWB Consulting Engineers | $1,104,000 |
55 | GRAEF | $1,071,182 |
56 | Halff Associates | $1,050,000 |
57 | ThermalTech Engineering | $1,000,000 |
58 | KCI Technologies | $1,000,000 |
59 | Primera Engineers | $998,099 |
60 | Tec Inc. Engineering & Design | $952,708 |
61 | STV | $809,257 |
62 | Smith Seckman Reid | $786,896 |
63 | Allen & Shariff | $650,000 |
64 | Highland Associates | $600,000 |
65 | OLA Consulting Engineers | $530,000 |
66 | Arora Engineers | $416,266 |
67 | DeSimone Consulting Engineers | $399,510 |
68 | Schaefer | $363,251 |
69 | KLH Engineers | $341,251 |
70 | KCL Engineering | $315,881 |
71 | BRPH Architects Engineers | $311,436 |
72 | Stanley Consultants | $296,930 |
73 | Wallace Engineering | $250,000 |
74 | Pedco E & A Services | $229,000 |
75 | PS&S | $201,000 |
76 | PBS Engineers | $200,000 |
77 | ESD | $155,410 |
78 | Milhouse Engineering and Construction | $130,844 |
79 | Apogee Consulting Group | $111,500 |
80 | Davis, Bowen & Friedel | $72,243 |
81 | Paradigm Structural Engineers | $15,917 |
82 | SSC Engineering | $9,630 |
Top 80 University Sector Contractors and CM Firms for 2020 | ||
FIRM | 2019 REVENUE | |
1 | Turner Construction Company | $1,541,584,819 |
2 | Skanska USA | $746,999,591 |
3 | McCarthy Holdings | $569,632,212 |
4 | DPR Construction | $509,070,000 |
5 | STO Building Group | $499,000,000 |
6 | Webcor | $427,052,230 |
7 | Hensel Phelps | $400,251,848 |
8 | Shawmut Design and Construction | $379,395,737 |
9 | Gilbane Building Company | $358,790,000 |
10 | Whiting-Turner Contracting Company, The | $316,657,986 |
11 | Swinerton | $276,600,000 |
12 | PCL Construction Enterprises | $271,407,871 |
13 | AECOM | $260,500,000 |
14 | Sundt Construction | $245,965,667 |
15 | Messer Construction | $227,389,994 |
16 | Balfour Beatty US | $226,042,141 |
17 | CORE Construction Group | $195,621,623 |
18 | C.W. Driver Companies | $190,768,284 |
19 | JE Dunn Construction | $174,995,367 |
20 | LeChase Construction Services | $162,317,365 |
21 | Pepper Construction | $156,970,847 |
22 | Suffolk Construction | $155,710,970 |
23 | Barton Malow | $143,430,531 |
24 | Walbridge | $126,749,342 |
25 | Mortenson | $124,044,000 |
26 | Adolfson & Peterson Construction | $121,728,329 |
27 | Austin Industries | $112,666,815 |
28 | Holder Construction | $110,000,000 |
29 | Nabholz Corporation | $108,888,907 |
30 | Andersen Construction | $99,800,000 |
31 | Hathaway Dinwiddie Construction | $97,402,000 |
32 | Power Construction | $97,000,000 |
33 | Hunter Roberts Construction | $95,600,000 |
34 | Fortis Construction | $84,234,878 |
35 | Manhattan Construction Group | $75,370,983 |
36 | Brasfield & Gorrie | $61,595,403 |
37 | Clark Group | $57,346,856 |
38 | Haselden Construction | $55,023,321 |
39 | W.E. O'Neil Construction | $52,862,066 |
40 | W. M. Jordan Company | $47,096,879 |
41 | Boldt Company, The | $46,039,000 |
42 | Yates Companies, The | $36,347,000 |
43 | Hill & Wilkinson General Contractors | $34,469,071 |
44 | Hoar Construction | $32,649,000 |
45 | Choate Construction | $29,501,255 |
46 | New South Construction | $28,150,000 |
47 | Clancy & Theys Construction | $27,873,564 |
48 | Rogers-O'Brien Construction | $24,430,000 |
49 | Jacobs | $23,813,000 |
50 | Walsh Group, The | $22,088,063 |
51 | Robins & Morton | $20,152,456 |
52 | Juneau Construction Company | $19,827,483 |
53 | Kraus-Anderson Construction | $19,000,000 |
54 | Bette Companies, The | $18,364,676 |
55 | Hoffman Construction | $17,787,788 |
56 | James G. Davis Construction | $16,737,402 |
57 | HITT Contracting | $15,115,259 |
58 | Cumming | $15,047,250 |
59 | Gray Construction | $14,420,540 |
60 | Paric Holdings | $13,800,000 |
61 | Columbia | $13,000,000 |
62 | Russell Construction | $12,000,000 |
63 | McCownGordon Construction, LLC | $11,645,829 |
64 | Wohlsen Construction | $11,479,000 |
65 | Hill International | $10,304,373 |
66 | Executive Construction | $10,000,000 |
67 | S. M. Wilson | $9,328,160 |
68 | Wendel | $8,683,083 |
69 | Sachse Construction | $7,000,000 |
70 | Lendlease | $5,682,260 |
71 | STV | $4,859,801 |
72 | S/L/A/M Collaborative, The | $3,908,000 |
73 | Ryan Companies US | $3,273,708 |
74 | JLL | $1,853,656 |
75 | Cotter Consulting | $1,405,501 |
76 | Benchmark Construction | $1,143,729 |
77 | Burns & McDonnell | $812,277 |
78 | JLG Architects | $647,791 |
79 | KCI Technologies | $500,000 |
80 | BL Harbert International | $497,465 |
81 | Doster Construction | $481,207 |
82 | Brownstone | $372,272 |
83 | Progressive AE | $196,612 |
84 | KBE Building Corporation | $107,782 |
BACK TO THE 2020 GIANTS 400 LANDING PAGE
Related Stories
Sustainability | Mar 13, 2024
Trends to watch shaping the future of ESG
Gensler’s Climate Action & Sustainability Services Leaders Anthony Brower, Juliette Morgan, and Kirsten Ritchie discuss trends shaping the future of environmental, social, and governance (ESG).
Affordable Housing | Mar 12, 2024
An all-electric affordable housing project in Southern California offers 48 apartments plus community spaces
In Santa Monica, Calif., Brunson Terrace is an all-electric, 100% affordable housing project that’s over eight times more energy efficient than similar buildings, according to architect Brooks + Scarpa. Located across the street from Santa Monica College, the net zero building has been certified LEED Platinum.
Museums | Mar 11, 2024
Nebraska’s Joslyn Art Museum to reopen this summer with new Snøhetta-designed pavilion
In Omaha, Neb., the Joslyn Art Museum, which displays art from ancient times to the present, has announced it will reopen on September 10, following the completion of its new 42,000-sf Rhonda & Howard Hawks Pavilion. Designed in collaboration with Snøhetta and Alley Poyner Macchietto Architecture, the Hawks Pavilion is part of a museum overhaul that will expand the gallery space by more than 40%.
Affordable Housing | Mar 11, 2024
Los Angeles’s streamlined approval policies leading to boom in affordable housing plans
Since December 2022, Los Angeles’s planning department has received plans for more than 13,770 affordable units. The number of units put in the approval pipeline in roughly one year is just below the total number of affordable units approved in Los Angeles in 2020, 2021, and 2022 combined.
BIM and Information Technology | Mar 11, 2024
BIM at LOD400: Why Level of Development 400 matters for design and virtual construction
As construction projects grow more complex, producing a building information model at Level of Development 400 (LOD400) can accelerate schedules, increase savings, and reduce risk, writes Stephen E. Blumenbaum, PE, SE, Walter P Moore's Director of Construction Engineering.
AEC Tech | Mar 9, 2024
9 steps for implementing digital transformation in your AEC business
Regardless of a businesses size and type, digital solutions like workflow automation software, AI-based analytics, and integrations can significantly enhance efficiency, productivity, and competitiveness.
Office Buildings | Mar 8, 2024
Conference room design for the hybrid era
Sam Griesgraber, Senior Interior Designer, BWBR, shares considerations for conference room design in the era of hybrid work.
Architects | Mar 8, 2024
98 architects elevated to AIA's College of Fellows in 2024
The American Institute of Architects (AIA) is elevating 96 member-architects and 2 non-member-architects to its College of Fellows, an honor awarded to architects who have made significant contributions to the profession. The fellowship program was developed to elevate architects who have achieved a standard of excellence in the profession and made a significant contribution to architecture and society on a national level.
Sports and Recreational Facilities | Mar 7, 2024
Bjarke Ingels’ design for the Oakland A’s new Las Vegas ballpark resembles ‘a spherical armadillo’
Designed by Bjarke Ingels Group (BIG) in collaboration with HNTB, the new ballpark for the Oakland Athletics Major League Baseball team will be located on the Las Vegas Strip and offer panoramic views of the city skyline. The 33,000-capacity covered, climate-controlled stadium will sit on nine acres on Las Vegas Boulevard.
Adaptive Reuse | Mar 7, 2024
3 key considerations when converting a warehouse to a laboratory
Does your warehouse facility fit the profile for a successful laboratory conversion that can demand higher rents and lower vacancy rates? Here are three important considerations to factor before proceeding.