flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

2019 Oregon Zero Energy Ready commercial code will boost efficiency by 14%

Codes and Standards

2019 Oregon Zero Energy Ready commercial code will boost efficiency by 14%

ASHRAE 90.1 is the basis for new code that went into effect Oct. 1.


By Peter Fabris, Contributing Editor | January 8, 2020

Courtesy Pixabay

Oregon’s new commercial building code will create an energy efficiency increase in commercial buildings estimated at more than 14% from the previous code.

The 2019 Oregon Zero Energy Ready Commercial Code went into effect Oct. 1, 2019, and is now in a three-month transition period until January 1, 2020 when it will be fully enforced on new projects. The new code is based on ASHRAE 90.1-2016. The previous code was based on the IECC 2009.

Among the new requirements:

· Manual lighting controls are now required for all spaces and the area of control is increased to 2,500 sf. In larger spaces, the new code allows a manual switch to control an area up to 10,000 sf.

· The occupancy sensor shut-off time delay is reduced from 30 minutes to 20 minutes for added energy savings.

· The list of spaces requiring occupancy sensors is expanded to now include corridors, lobbies, library stacks, lecture halls, multipurpose rooms, stairwells, and warehouses.

· A new requirement called “Automatic partial-off”, reduces lighting power by at least 50% when there is no occupancy in corridors, lobbies, library stacks, classroom laboratories, stairwells, warehouses, and large storage rooms.

· A secondary sidelight daylighting control zone is added adjacent to the primary sidelight zone.

· A new parking garage lighting provision is added requiring lighting shut-off, 30% light power reduction when there is no activity, vehicle entrance and exit lighting controls, and daylighting controls.

Related Stories

| Oct 31, 2013

Effects of green, white roofs to be compared at Walmart in Oregon

Portland State University will construct a 40,000 sf green roof research site on the top of a new Walmart store in North Portland, Ore., and compare it to a 52,000 sf section of roof with a white membrane.

| Oct 31, 2013

GSA okays Green Globes; USGBC counters forestry industry concerns

Green Globes, a LEED rival, was recently declared to be nearly equal with LEED standards by the General Services Administration.

| Oct 25, 2013

California struggles with updated seismic codes

In California, there are still hundreds of concrete buildings that need reinforcement to bring them up to the new seismic code.

| Oct 24, 2013

Supplement No. 2 to AISC 358-10 Prequalified Moment Connection Standard available for public review

Supplement No. 2 to the American Institute of Steel Construction (AISC) standard Prequalified Connections for Special and Intermediate Steel Moment Frames for Seismic Applications (AISC 358-10) is now available for public review.

| Oct 24, 2013

Changes in LEED v4 will have large impact on materials manufacturers

Changes to LEED in LEED v4 are so dramatic that they will send ripples into other industries and shift expectations on sustainability reporting and performance far beyond the building industry.

| Oct 24, 2013

D.C. office buildings going green at twice the national average

In 2011, about 33% of new office buildings in the U.S. were built to green standards, but in the nation’s capital that rate has skyrocketed.

| Oct 18, 2013

AGC considers suit over new hiring goals for vets, disabled

The Associated General Contractors of America and the HR Policy Association are reportedly considering taking legal action over the Labor Department's new hiring goals for veterans and disabled people.

| Oct 18, 2013

Cities may be more capable of driving sustainability than nations, experts say

With countries not tackling climate change aggressively, cities are in the best position to drive increased sustainability.

| Oct 8, 2013

Kansas City board OKs $1.6 billion TIF for $4.3 billion redevelopment project

Kansas City’s Tax Increment Financing Commission voted unanimously to forward the Bannister & I-435 TIF Plan to the Kansas City Council for approval.

| Oct 8, 2013

New Orleans advances $1 billion construction plan including new airport terminal

New Orleans plans to invest $1.1 billion in construction projects over the next five years.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021