flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

2019 Oregon Zero Energy Ready commercial code will boost efficiency by 14%

Codes and Standards

2019 Oregon Zero Energy Ready commercial code will boost efficiency by 14%

ASHRAE 90.1 is the basis for new code that went into effect Oct. 1.


By Peter Fabris, Contributing Editor | January 8, 2020

Courtesy Pixabay

Oregon’s new commercial building code will create an energy efficiency increase in commercial buildings estimated at more than 14% from the previous code.

The 2019 Oregon Zero Energy Ready Commercial Code went into effect Oct. 1, 2019, and is now in a three-month transition period until January 1, 2020 when it will be fully enforced on new projects. The new code is based on ASHRAE 90.1-2016. The previous code was based on the IECC 2009.

Among the new requirements:

· Manual lighting controls are now required for all spaces and the area of control is increased to 2,500 sf. In larger spaces, the new code allows a manual switch to control an area up to 10,000 sf.

· The occupancy sensor shut-off time delay is reduced from 30 minutes to 20 minutes for added energy savings.

· The list of spaces requiring occupancy sensors is expanded to now include corridors, lobbies, library stacks, lecture halls, multipurpose rooms, stairwells, and warehouses.

· A new requirement called “Automatic partial-off”, reduces lighting power by at least 50% when there is no occupancy in corridors, lobbies, library stacks, classroom laboratories, stairwells, warehouses, and large storage rooms.

· A secondary sidelight daylighting control zone is added adjacent to the primary sidelight zone.

· A new parking garage lighting provision is added requiring lighting shut-off, 30% light power reduction when there is no activity, vehicle entrance and exit lighting controls, and daylighting controls.

Related Stories

Codes and Standards | Jun 21, 2017

Senate bill would prohibit tax money for sports stadium projects

Bipartisan legislation would prevent use of municipal bonds by pro teams.

Codes and Standards | Jun 19, 2017

Developer, architect hit with $10 million construction defect verdict

Case pertained to construction of condo development that was not fire code-compliant.

Codes and Standards | Jun 15, 2017

Cornell Tech unveils plans to reach Net Zero at The Bloomberg Center

Campus plans include photovoltaic arrays and geothermal ground source heat pumps.

Codes and Standards | Jun 13, 2017

Canada Green Building Council and Green Business Certification Inc. announce partnership

New joint venture will deliver enhanced services and support tools and programs throughout Canada.

Codes and Standards | Jun 8, 2017

Nail-Laminated Timber Design and Construction Guide released

New document focuses on design and construction considerations for horizontal NLT applications.

Codes and Standards | Jun 8, 2017

Car sharing popularity means parking zoning and codes may be promoting overbuilding of garages

Some designers look to modular designs in anticipation of alternate uses.

Codes and Standards | Jun 7, 2017

IAPMO advances toward new 2017 Water Efficiency and Sanitation Standard

Revised pipe-sizing method for residential applications will be included.

Codes and Standards | Jun 7, 2017

New Colorado law could stimulate stalled condo market

Construction defect law modifications could ease litigation risk and cut insurance rates.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021