flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

2019 Oregon Zero Energy Ready commercial code will boost efficiency by 14%

Codes and Standards

2019 Oregon Zero Energy Ready commercial code will boost efficiency by 14%

ASHRAE 90.1 is the basis for new code that went into effect Oct. 1.


By Peter Fabris, Contributing Editor | January 8, 2020

Courtesy Pixabay

Oregon’s new commercial building code will create an energy efficiency increase in commercial buildings estimated at more than 14% from the previous code.

The 2019 Oregon Zero Energy Ready Commercial Code went into effect Oct. 1, 2019, and is now in a three-month transition period until January 1, 2020 when it will be fully enforced on new projects. The new code is based on ASHRAE 90.1-2016. The previous code was based on the IECC 2009.

Among the new requirements:

· Manual lighting controls are now required for all spaces and the area of control is increased to 2,500 sf. In larger spaces, the new code allows a manual switch to control an area up to 10,000 sf.

· The occupancy sensor shut-off time delay is reduced from 30 minutes to 20 minutes for added energy savings.

· The list of spaces requiring occupancy sensors is expanded to now include corridors, lobbies, library stacks, lecture halls, multipurpose rooms, stairwells, and warehouses.

· A new requirement called “Automatic partial-off”, reduces lighting power by at least 50% when there is no occupancy in corridors, lobbies, library stacks, classroom laboratories, stairwells, warehouses, and large storage rooms.

· A secondary sidelight daylighting control zone is added adjacent to the primary sidelight zone.

· A new parking garage lighting provision is added requiring lighting shut-off, 30% light power reduction when there is no activity, vehicle entrance and exit lighting controls, and daylighting controls.

Related Stories

Codes and Standards | May 7, 2018

Plan advances in Los Angeles for Climate Emergency Mobilization Department

Would oversee efforts to reduce greenhouse gas emissions across the city.

Codes and Standards | May 3, 2018

Data collection, machine learning boost building efficiency

Sensors, software algorithms squeeze out waste.

Codes and Standards | May 1, 2018

ASHRAE publishes new energy simulation-aided design standard

Requires building energy modeling during schematic design.

Codes and Standards | Apr 30, 2018

CALGreen projects pre-approved for streamlined LEED v4 requirements

Reduces need to run additional energy models.

Codes and Standards | Apr 26, 2018

New standard supports community resilience

ASTM International guidance supports cost-effective ways to withstand and recover from disasters.

Codes and Standards | Apr 25, 2018

Lessons learned from decades of Superfund cleanups guide contaminated land reuse

Sites repurposed for residential, commercial use, and solar energy generation.

Codes and Standards | Apr 24, 2018

Vibrant downtown core the key for urban multifamily development

Nighttime activity makes the difference.

Codes and Standards | Apr 19, 2018

ILFI launches new Zero Carbon Certification

Offers greater flexibility around project fuel types and offsetting renewables.

Codes and Standards | Apr 18, 2018

New Green Globe pilot program launched

Precursor to revised Green Globes Assessment Protocol for Commercial Buildings.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021