For 40 years, the editors of Building Design+Construction have ranked the nation's largest AEC firms as part of the Giants 300 report. Below, we present the findings of our 2016 Giants 300 Report.
Data for our Giants 300 charts is based on information supplied by the respective firms. Firms are asked to verify the accuracy of their data.
The Construction section includes two types of statistics. The Contractors chart reflects revenues for general contracting, design-build, CM at risk, and IPD—projects where all revenues flow through the contractor. The CM Agent + PM chart lists firms that derive their revenues through fees.
In the subsequent market-specific sections (Healthcare, Data Centers, Multifamily, Government, etc.) data labeled “Construction” includes all delivery methods combined (GC, DB, CM at risk, IPD, CM agent, PM).
We'd like to thank our Giants 300 sponsors for their support of the recognition program:
Rankings By Discipline
ARCHITECTURE GIANTS (top A and AE firms) | Read Report | Sponsored by SageGlass
ENGINEERING GIANTS (top E and EA firms) | Read Report | Sponsored by Viega
CONSTRUCTION GIANTS (top GC and CM firms) | Read Report | Sponsored by AGC of America
Rankings by Specialty
BIM REPORT | Read Report
GREEN BUILDING SECTOR GIANTS | Read Report | Sponsored by Trane
RECONSTRUCTION SECTOR GIANTS | Read Report
Rankings by Building Sector
AIRPORT TERMINAL SECTOR GIANTS | Read Report | Sponsored by Leidos
CONVENTION CENTER GIANTS | Read Report
COURTHOUSE SECTOR GIANTS | Read Report
CULTURAL FACILITIES GIANTS | Read Report
DATA CENTER SECTOR GIANTS | Read Report
FEDERAL GOVERNMENT GIANTS | Read Report
HEALTHCARE SECTOR GIANTS | Read Report
HOTEL SECTOR GIANTS | Read Report
INDUSTRIAL SECTOR GIANTS | Read Report
K-12 SCHOOL SECTOR GIANTS | Read Report | Sponsored by MortarNet
LOCAL GOVERNMENT GIANTS | Read Report
MILITARY SECTOR GIANTS | Read Report
MULTIFAMILY SECTOR GIANTS | Read Report | Sponsored by Delta Faucet
OFFICE SECTOR GIANTS | Read Report
RELIGIOUS FACILITIES GIANTS Read Report
RETAIL SECTOR GIANTS | Read Report
SCIENCE AND TECHNOLOGY SECTOR GIANTS | Read Report
SPORTS FACILITY SECTOR GIANTS | Read Report
STATE GOVERNMENT GIANTS | Read Report
TRANSIT/TOD SECTOR GIANTS | Read Report
UNIVERSITY SECTOR GIANTS | Read Report
Related Stories
| Nov 1, 2010
Vancouver’s former Olympic Village shoots for Gold
The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.
| Oct 27, 2010
Grid-neutral education complex to serve students, community
MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.
| Oct 21, 2010
GSA confirms new LEED Gold requirement
The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.
| Oct 18, 2010
World’s first zero-carbon city on track in Abu Dhabi
Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.
| Oct 13, 2010
Editorial
The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.
| Oct 13, 2010
Test run on the HP Z200 SFF Good Value in a Small Package
Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.
| Oct 13, 2010
Prefab Trailblazer
The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.
| Oct 13, 2010
Thought Leader
Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.
| Oct 13, 2010
Hospital tower gets modern makeover
The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.