flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

2015 gypsum fire resistance design manual released

Codes and Standards

2015 gypsum fire resistance design manual released

The 2015 edition contains nearly 100 new systems that supplement existing assemblies for walls and partitions, floor-ceiling systems, area separation walls, and many others.


By Peter Fabris, Contributing Editor | July 31, 2015
2015 gypsum fire resistance design manual released

Photo courtesy of the Gypsum Association

The Gypsum Association has released the 21st edition of the Fire Resistance Design ManualRevised every three years, GA-600 has been referenced by the model building codes as a source of fire resistive designs for more than 40 years.

The 2015 edition contains nearly 100 new systems that supplement existing assemblies for walls and partitions, floor-ceiling systems, area separation walls, and many others. Among these, are 20 new head-of-wall and base-of-wall systems that significantly expand the options for perimeter relief.

A more interactive digital version of the Fire Resistance Design Manual (FRDM) is available with the 2015 edition. More like an e-reader than previous PDF versions, the new digital manual is searchable, easy to navigate, delivered on demand, and allows users to print specific pages for reference, the association says. Customers who purchase the electronic version will receive a complimentary hardcopy.

The FRDM is referenced by the International Building Code, and The National Fire Codes, as well as many state and local jurisdictions in the U.S. and Canada as a source document for fire-resistance and sound-control rated designs that incorporate gypsum board in a variety of building systems. 

Related Stories

| Feb 20, 2012

Comment period for update to USGBC's LEED Green Building Program now open

This third draft of LEED has been refined to address technical stringency and rigor, measurement and performance tools, and an enhanced user experience.

| Feb 20, 2012

GAF introduces web portal for architects and specifiers

The new portal offers a clean look with minimal clutter to make it easier to find the technical information and product data that architects need.

| Feb 17, 2012

AGC advocates for federal procurement reform

Ensure that small business goals take into consideration actual small business capacity in relevant specialty markets.

| Feb 17, 2012

Codes not to blame for Anchorage roof collapses following heavy snows

Design or construction problems likely contributed to the collapses, according to city officials.

| Feb 17, 2012

Comment period opens March 1 for LEED 2012 update

USGBC says that LEED's strength comes from its continuous evolution.

| Feb 17, 2012

OSHA training videos on proper respirator use available online

17 short videos to help workers learn about the proper use of respirators on the job.

| Feb 17, 2012

Union/employer collaboration on the rise aimed at exceeding OSHA safety standards

Unions have learned to help employers win contracts with bids made competitive through good safety practices.

| Feb 16, 2012

Gain greater agility and profitability with ArchiCAD BIM software

White paper was written with the sole purpose of providing accurate, reliable information about critical issues related to BIM and what ArchiCAD with advanced technology such as the GRAPHISOFT BIM Server provide as an answer to address these issues.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021