flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

2012 White Paper: High-Performance Reconstructed Buildings: The 99% Solution

2012 White Paper: High-Performance Reconstructed Buildings: The 99% Solution

Download the complete White Paper, Chapters 1-10


May 11, 2012
This article first appeared in the May 2012 issue of BD+C.

Click here to download a PDF of High-Performance Reconstructed Buildings: The 99% Solution, the 9th in a Series of White Papers on the Green Building Movement

Ā 


Ā 

Reconstruction in its many formsā€”tenant improvements, retail fitouts, adaptive reuse, historic preservation, gut rehab, and so onā€”is keeping many design and construction firms solvent.

The collapse of the U.S. housing market in 2007-2008 precipitated a nearly commensurate downturn in new nonresidential construction in the United States. Filling the gap, at least to some extent, has been reconstruction.

Architecture, engineering, and construction firms that once realized less than 20% of their revenues from renovation work are now performing 30-40% of their work in reconstruction. Another telling metric: LEED for Existing Buildings has now surpassed LEED for New Construction in total floor space. It is no exaggeration to say that reconstruction is keeping many AEC firms afloat.

This chain of events has created an excellent opportunity for the design and construction industry to seek ways to take reconstruction to the next highest level: from 20-30% energy and water savings, for example, to 40-60%ā€”what those in the field are calling ā€œdeep energy retrofits.ā€

This White Paper details the obstacles to achieving high-performance reconstructed buildings and describes the promising opportunities available to AEC firms in this sector of the green building market.

The editors argue the case that existing and reused buildings represent ā€œthe 99% solutionā€ for reducing energy, water, and materials waste in buildings and cutting the share of greenhouse gases produced by nonresidential buildings.

As in our eight previous White Papers, we conclude with a set of specific recommendationsā€”an 18-point Action Planā€”for stakeholders in the built environment to consider.

The editors welcome your feedback. Please contact Robert Cassidy, Editorial Director, at 847-391-1040; rcassidy@sgcmail.com.

Ā 

Click here to download a PDF of High-Performance Reconstructed Buildings: The 99% Solution, the 9th in a Series of White Papers on the Green Building Movement

Ā 

Chapter 1 Reconstruction: ā€˜The 99% Solutionā€™ for Energy Savings in Buildings

Ā 

Chapter 2 Exemplary High-Performance Reconstruction Projects

Ā 

Chapter 3 How Building Technologies Contribute to Reconstruction Advances

Ā 

Chapter 4 Business Case for High-Performance Reconstructed Buildings

Ā 

Chapter 5 LEED-EB and Green Globes CIEB: Rating Sustainable Reconstruction

Ā 

Chapter 6 Energy Codes + Reconstructed Buildings: 2012 and Beyond

Ā 

Chapter 7 When Modern Becomes Historic: Preserving the Modernist Building Envelope

Ā 

Chapter 8 High-Performance Reconstruction and Historic Preservation: Conflict and Opportunity

Ā 

Chapter 9 The Key to Commissioning That Works? It Never Stops

Ā 

Chapter 10 Action Plan: 18 Recommendations for Advancing Sustainability in Reconstructed Buildings

Ā 

DIRECTORY OF SPONSORS

Associations
Construction Specifications Institute
North American Insulation Manufacturers Association
The Vinyl Institute

Government
U.S. General Services AdministrationĀ Ā  Public Buildings Service

Manufacturers
Duro-Last Roofing, Inc.
SAGE Electrochromics, Inc.
Sika Sarnafil

Related Stories

| Sep 24, 2014

Architecture billings see continued strength, led by institutional sector

On the heels of recording its strongest pace of growth since 2007, there continues to be an increasing level of demand for design services signaled in the latest Architecture Billings Index.

| Sep 24, 2014

Frank Gehry's first building in Latin America will host grand opening on Oct. 2

Gehry's design for the Biomuseo, or Museum of Biodiversity, draws inspiration from the site's natural and cultural surroundings, including local Panamaian tin roofs.

| Sep 23, 2014

Cedars-Sinai looks to streamline trauma care with first-of-its-kind OR360 simulation space

The breakthrough simulation center features moveable walls and a modular ceiling grid that allow doctors and military personnel to easily reconfigure the shape and size of the space.

| Sep 23, 2014

Third phase of New Yorkā€™s High Line redevelopment opens

The $35 million Phase 3, known as High Line at the Rail Yards, broke ground September 20, 2012, and officially opened to the public on September 21.

| Sep 23, 2014

Cloud-shaped skyscraper complex wins Shenzhen Bay Super City design competition

Forget the cubist, clinical, glass and concrete jungle of today's financial districts. Shenzhen's new plan features a complex of cloud-shaped skyscrapers connected to one another with sloping bridges.

| Sep 23, 2014

Designing with Water: Report analyzes ways coastal cities can cope with flooding

The report contains 12 case studies of cities around the world that have applied advanced flood management techniques.Ā 

| Sep 22, 2014

4 keys to effective post-occupancy evaluations

Perkins+Will's Janice Barnes covers the four steps that designers should take to create POEs that provide design direction and measure design effectiveness.

| Sep 22, 2014

NCARB overhauls Intern Development Program, cuts years off licensure process

The newly adopted changes will be implemented in two phases. The first will streamline the program by focusing on the IDPā€™s core requirements and removing its elective requirements. The second phase will condense the 17 current experience areas into six practice-based categories.

| Sep 22, 2014

Biloxiā€™s new Maritime and Seafood Industry Museum is like a ship in a bottle

Nine years after the Museum of Maritime and Seafood Industry in Biloxi, Miss., was damaged by Hurricane Katrinaā€™s 30-foot tidal surge, the museum reopened its doors in a brand new, H3-designed building.Ā 

| Sep 22, 2014

Swanke-designed Eurasia Tower opens in Moscow

The 72-story towerā€”the first mixed-use, steel tower in Russiaā€”is located within the new, 30 million-sf, 148-acre Moscow International Business Center.

boombox1
boombox2
native1

More In Category

Construction Costs

Data center construction costs for 2024

Gordianā€™s data features more than 100 building models, includingĀ computer data centers. These localized models allow architects, engineers, and other preconstruction professionals to quickly and accurately create conceptual estimates for futureĀ builds. This table shows a five-year view of costs per square footĀ forĀ one-story computer data centers.Ā 


Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.



Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021

Ā