flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

2012 LEED for Homes Award recipients announced

2012 LEED for Homes Award recipients announced

USGBC recognizes excellence in the green residential building community at its Greenbuild Conference & Expo in San Francisco


By Posted by Tim Gregorski, Senior Editor | November 13, 2012

The U.S. Green Building Council (USGBC) has named the recipients of the 2012 LEED for Homes Awards, recognizing projects, developers and homebuilders that have demonstrated leadership in the residential green building marketplace. The awards will be presented during the Residential Summit reception on Thursday, Nov. 15, 2012, at the Greenbuild International Conference & Expo held in San Francisco. The award categories recognize innovative multi- and single-family projects, production builders, affordable housing projects and developers, an overall commitment to LEED for Homes and Project of the Year.

“This year’s leadership recipients represent a dynamic field showcasing the range of residential developments that certify under USGBC’s LEED for Homes program each year,” said Nate Kredich, vice president, Residential Market Development, USGBC. “The fact that our project of the year is an affordable housing development that achieved LEED Platinum certification is a shining example of how diversified the LEED for Homes portfolio has become.”

Winners for this year include:

  • Project of the Year – The Puyallup Longhouse’s the Place of Hidden Waters: This LEED Platinum certified housing project is a culturally and environmentally responsive new model for the Puyallup Tribe in the Pacific NW. It’s located on the Puyallup reservation on a hill overlooking the Puget Sound tide flats, which were traditional Puyallup tribal lands. The buildings are designed to emulate the rectangular, shed roofed form of a traditional Coast Salish longhouse using a variation of the modern townhouse courtyard building. Structural insulated panels with excellent air sealing for a well-insulated envelope, triple pane windows and ground source heat pumps for both domestic hot water and hydronic heating systems are some of the sustainable features.
  • Outstanding Production Builder – Clarum Communities for Cambridge Plaza: Located in Palo Alto, Calif., Cambridge Plaza is a three-story townhome project constructed by Clarum Homes that achieved a LEED Platinum rating thanks to sustainable building materials and a commitment to energy and water efficiency. Its “smart” design features include a photovoltaic system and a thermal solar hot water system using a 80 gallon pre-heat storage tank and a G.E. GeoSpring electric heat pump back up waterheater.
  • Outstanding Affordable Developer - Avesta Housing for Oak Street Lofts: This project is the first affordable multifamily building to achieve LEED Platinum in Maine. The building is a four-story, 37-unit building located in the heart of Portland's Art District. The project stands out as it incorporates many design innovations, which illustrate that even affordable housing projects, with limited capital budgets, can achievehigh rates of energy efficiency and enhanced comfort for occupants. The building achieved a preliminary energy savings of 35 percent better than ASHRAE with a 40.94 percent energy cost savings.
  • Outstanding Affordable Project – Rio Vista Apartments, Abode Communities: This is the first development in LA County to co-locate affordable housing with an educational component owned and operated by the Los Angeles Unified School District on the District’s surplus land. The LEED Platinum apartments transform a vacant parking lot into a model joint-use development addressing the needs of 50 low-income families. The site is a high-density infill, a former brownfield with existing infrastructure, and is located with access to outstanding community resources. Rio Vista is energy efficient (exceeds Title 24 by 40 percent) and includes an edible garden atop the roof with a central trellised courtyard providing a shaded outdoor space to reduce heat island effects.
  • Outstanding Commitment to LEED for Homes – McGuyer Homebuilders, Inc. (MHI): The Texas-based company is the only national-scale production homebuilder that has successfully implemented LEED for Homes across multiple communities and across multiple product offerings. MHI is a practical, profit-oriented builder who pursues LEED as a strategy to meet client needs. MHI strives to find ways to successfully compete with the publically traded homebuilding companies by offering something new and different.
  • Outstanding Multifamily Project – Specialized Real Estate Group for Eco Modern Flats: This LEED Platinum project is a gut rehab of a 96-unit market rate apartment complex built between 1968 and1972 and located in Fayetteville, Ark. The developers’ goals were to deliver a product that was not currently available in the market—modern, urban, green multifamily rental—and to save operations costs through energy and water-saving updates. In addition to the rehab itself, a blog and other informational resources were developed, and hundreds of people toured a model unit highlighting 32 sustainable strategies employed in the project.
  • Outstanding Single Family Project – Brooks Residence (architect Isabelle Duvivier): Located in Venice, Calif., the Brooks Residence is a 1,700 sq. ft. LEED Platinum home. Homeowner and architect, Isabelle Duvivier, purchased the 100-year-old home in a well-established, low-income neighborhood in order to restore it. The goal was to reduce the footprint/impact of the house on the planet through water, energy and material efficiency. Above and beyond that goal, the home designworks to restore habitats for birds, bees and butterflies and creates educational opportunities for the local community. +

Related Stories

| Jan 19, 2011

Museum design integrates Greek history and architecture

Construction is under way in Chicago on the National Hellenic Museum, the nation’s first museum devoted to Greek history and culture. RTKL designed the 40,000-sf limestone and glass building to include such historic references as the covered walkway of classical architecture and the natural wood accents of Byzantine monasteries. The museum will include a research library and oral history center, plus a 3,600-sf rooftop terrace featuring three gardens. The project seeks LEED Silver.

| Jan 19, 2011

Architecture Billings Index jumped more than 2 points in December

On the heels of its highest mark since 2007, the Architecture Billings Index jumped more than two points in December. The American Institute of Architects reported the December ABI score was 54.2, up from a reading of 52.0 the previous month. 

| Jan 19, 2011

Large-Scale Concrete Reconstruction Solid Thinking

Driven by both current economic conditions and sustainable building trends, Building Teams are looking more and more to retrofits and reconstruction as the most viable alternative to new construction. In that context, large-scale concrete restoration projects are playing an important role within this growing specialty.

| Jan 10, 2011

Architect Jean Nouvel designs an island near Paris

Abandoned by carmaker Renault almost 20 years ago, Seguin Island in Boulogne-Billancourt, France, is being renewed by architect Jean Nouvel. Plans for the 300,000-square-meter project includes a mix of culture, commerce, urban parks, and gardens, which officials hope will attract both Parisians and tourists.

| Jan 10, 2011

Michael J. Alter, president of The Alter Group: ‘There’s a significant pent-up demand for projects’

Michael J. Alter, president of The Alter Group, a national corporate real estate development firm headquartered in Skokie, Ill., on the growth of urban centers, project financing, and what clients are saying about sustainability.

| Jan 7, 2011

BIM on Target

By using BIM for the design of its new San Clemente, Calif., store, big-box retailer Target has been able to model the entire structural steel package, including joists, in 3D, chopping the timeline for shop drawings from as much as 10 weeks down to an ‘unheard of’ three-and-a-half weeks.

| Jan 7, 2011

How Building Teams Choose Roofing Systems

A roofing survey emailed to a representative sample of BD+C’s subscriber list revealed such key findings as: Respondents named metal (56%) and EPDM (50%) as the roofing systems they (or their firms) employed most in projects. Also, new construction and retrofits were fairly evenly split among respondents’ roofing-related projects over the last couple of years.

| Jan 7, 2011

Total construction to rise 5.1% in 2011

Total U.S. construction spending will increase 5.1% in 2011. The gain from the end of 2010 to the end of 2011 will be 10%. The biggest annual gain in 2011 will be 10% for new residential construction, far above the 2-3% gains in all other construction sectors.

| Jan 7, 2011

Mixed-Use on Steroids

Mixed-use development has been one of the few bright spots in real estate in the last few years. Successful mixed-use projects are almost always located in dense urban or suburban areas, usually close to public transportation. It’s a sign of the times that the residential component tends to be rental rather than for-sale.

boombox1
boombox2
native1

More In Category


Retail Centers

Thinking outside the big box (store)

For over a decade now, the talk of the mall industry has been largely focused on what developers can do to fill the voids left by a steady number of big box store closures. But what do you do when big box tenants stay put?


Government Buildings

OSHA’s proposed heat standard published in Federal Register

The Occupational Safety and Health Administration (OSHA) has published a proposed standard addressing heat illness in outdoor and indoor settings in the Federal Register. The proposed rule would require employers to evaluate workplaces and implement controls to mitigate exposure to heat through engineering and administrative controls, training, effective communication, and other measures.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021