flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

2012 LEED for Homes Award recipients announced

2012 LEED for Homes Award recipients announced

USGBC recognizes excellence in the green residential building community at its Greenbuild Conference & Expo in San Francisco


By Posted by Tim Gregorski, Senior Editor | November 13, 2012

The U.S. Green Building Council (USGBC) has named the recipients of the 2012 LEED for Homes Awards, recognizing projects, developers and homebuilders that have demonstrated leadership in the residential green building marketplace. The awards will be presented during the Residential Summit reception on Thursday, Nov. 15, 2012, at the Greenbuild International Conference & Expo held in San Francisco. The award categories recognize innovative multi- and single-family projects, production builders, affordable housing projects and developers, an overall commitment to LEED for Homes and Project of the Year.

“This year’s leadership recipients represent a dynamic field showcasing the range of residential developments that certify under USGBC’s LEED for Homes program each year,” said Nate Kredich, vice president, Residential Market Development, USGBC. “The fact that our project of the year is an affordable housing development that achieved LEED Platinum certification is a shining example of how diversified the LEED for Homes portfolio has become.”

Winners for this year include:

  • Project of the Year – The Puyallup Longhouse’s the Place of Hidden Waters: This LEED Platinum certified housing project is a culturally and environmentally responsive new model for the Puyallup Tribe in the Pacific NW. It’s located on the Puyallup reservation on a hill overlooking the Puget Sound tide flats, which were traditional Puyallup tribal lands. The buildings are designed to emulate the rectangular, shed roofed form of a traditional Coast Salish longhouse using a variation of the modern townhouse courtyard building. Structural insulated panels with excellent air sealing for a well-insulated envelope, triple pane windows and ground source heat pumps for both domestic hot water and hydronic heating systems are some of the sustainable features.
  • Outstanding Production Builder – Clarum Communities for Cambridge Plaza: Located in Palo Alto, Calif., Cambridge Plaza is a three-story townhome project constructed by Clarum Homes that achieved a LEED Platinum rating thanks to sustainable building materials and a commitment to energy and water efficiency. Its “smart” design features include a photovoltaic system and a thermal solar hot water system using a 80 gallon pre-heat storage tank and a G.E. GeoSpring electric heat pump back up waterheater.
  • Outstanding Affordable Developer - Avesta Housing for Oak Street Lofts: This project is the first affordable multifamily building to achieve LEED Platinum in Maine. The building is a four-story, 37-unit building located in the heart of Portland's Art District. The project stands out as it incorporates many design innovations, which illustrate that even affordable housing projects, with limited capital budgets, can achievehigh rates of energy efficiency and enhanced comfort for occupants. The building achieved a preliminary energy savings of 35 percent better than ASHRAE with a 40.94 percent energy cost savings.
  • Outstanding Affordable Project – Rio Vista Apartments, Abode Communities: This is the first development in LA County to co-locate affordable housing with an educational component owned and operated by the Los Angeles Unified School District on the District’s surplus land. The LEED Platinum apartments transform a vacant parking lot into a model joint-use development addressing the needs of 50 low-income families. The site is a high-density infill, a former brownfield with existing infrastructure, and is located with access to outstanding community resources. Rio Vista is energy efficient (exceeds Title 24 by 40 percent) and includes an edible garden atop the roof with a central trellised courtyard providing a shaded outdoor space to reduce heat island effects.
  • Outstanding Commitment to LEED for Homes – McGuyer Homebuilders, Inc. (MHI): The Texas-based company is the only national-scale production homebuilder that has successfully implemented LEED for Homes across multiple communities and across multiple product offerings. MHI is a practical, profit-oriented builder who pursues LEED as a strategy to meet client needs. MHI strives to find ways to successfully compete with the publically traded homebuilding companies by offering something new and different.
  • Outstanding Multifamily Project – Specialized Real Estate Group for Eco Modern Flats: This LEED Platinum project is a gut rehab of a 96-unit market rate apartment complex built between 1968 and1972 and located in Fayetteville, Ark. The developers’ goals were to deliver a product that was not currently available in the market—modern, urban, green multifamily rental—and to save operations costs through energy and water-saving updates. In addition to the rehab itself, a blog and other informational resources were developed, and hundreds of people toured a model unit highlighting 32 sustainable strategies employed in the project.
  • Outstanding Single Family Project – Brooks Residence (architect Isabelle Duvivier): Located in Venice, Calif., the Brooks Residence is a 1,700 sq. ft. LEED Platinum home. Homeowner and architect, Isabelle Duvivier, purchased the 100-year-old home in a well-established, low-income neighborhood in order to restore it. The goal was to reduce the footprint/impact of the house on the planet through water, energy and material efficiency. Above and beyond that goal, the home designworks to restore habitats for birds, bees and butterflies and creates educational opportunities for the local community. +

Related Stories

| Apr 8, 2014

Understanding value billing vs. conventional billing

Every company is a sum of the value it delivers to its clients. What differs from one company to the next is how that value is delivered and perceived. All too often, it is based solely on the fee you charge.

| Apr 8, 2014

Science, engineering find common ground on the Northeastern University campus [slideshow]

The new Interdisciplinary Science and Engineering Building is designed to maximize potential of serendipitous meetings between researchers.

| Apr 8, 2014

40 Under 40 winners: Meet the contractors

Of the up-and-coming AEC professionals to be named to the class of 2014, nine make their living as contractors.

| Apr 7, 2014

40 Under 40 winners: Meet the architects

Of the up-and-coming AEC professionals to be named 40 Under 40 winners by the editors of Building Design+Construction, 21 make their living in the architecture profession.

| Apr 4, 2014

$25 million Orion Jet Center designed by SchenkelShultz now open

As the centerpiece of the 45-acre campus, which is its first phase of a planned 215-acre mixed-use development, the 18,000 square foot executive terminal facility offers spacious passenger areas, administrative space, an executive suite, rental car kiosk, catering and a cafe. 

| Apr 3, 2014

Security, accountability, and cloud access: Can you really have it all?

I’ve heard countless stories of conversations between project engineers and IT professionals who can’t come to an agreement on the level of security needed to protect their data while making it more accessible—not only externally, but also internally. 

| Apr 2, 2014

The new model of healthcare facility management

A growing number of healthcare organizations are moving to an integrated real estate model in an effort to better manage costs, respond to regulatory requirements, and support changes in patient care delivery.

| Apr 2, 2014

8 tips for avoiding thermal bridges in window applications

Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.

| Apr 2, 2014

Check out the stunning research facility just named 2014 Lab of the Year [slideshow]

NREL's Energy Systems Integration Facility takes top honors in R&D Magazine's 48th annual lab design awards. 

| Apr 1, 2014

The risks of mismatched fire-rated assemblies

Mismatched fire-rated glass and framing happens more often than you think. Failing to confirm that the tested and listed performance capabilities of the framing system match those of the glazing can create a financial nightmare for the entire building team. 

boombox1
boombox2
native1

More In Category


Museums

The Tampa Museum of Art will soon undergo a $110 million expansion

In Tampa, Fla., the Tampa Museum of Art will soon undergo a 77,904-sf Centennial Expansion project. The museum plans to reach its $110 million fundraising goal by late 2024 or early 2025 and then break ground. Designed by Weiss/Manfredi, and with construction manager The Beck Group, the expansion will redefine the museum’s surrounding site.



Reconstruction & Renovation

Movement to protect historic buildings raises sharp criticism

While the movement to preserve historic buildings has widespread support, it also has some sharp critics with well-funded opposition groups springing up in recent years. Some opponents are linked to the Stand Together Foundation, founded and bankrolled by the Koch family’s conservative philanthropic organization, according to a column in Governing magazine.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021

Â