flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

2012 Giants 300 survey due Friday, April 13

2012 Giants 300 survey due Friday, April 13

See how your firm ranks among the AEC industry leaders.


By By BD+C Staff | March 9, 2012

Submissions are due April 13, 2012. Results will be published in the July 2012 issue of Building Design+Construction and additional coverage will be available online at www.bdcnetwork.com

If you're just getting started, please use this slightly updated version of the Giants 300 survey. Please note the new questions about "Industrial Buildings" in 4B and "NEW Construction vs. RECONSTRUCTION" in 5F.

Explanation of "public sector tab" in Giants 300 survey

Important point: how to allocate revenues in the "Public Sector" tab and the "Building Type" tab. If, for example, your firm did an office building for the State of New York, you would put the revenues your firm earned for that project in "Office Buildings"  Building Type Tab 4B AND you would also count that same revenue in "State Government" in Public Sector Tab 4C.

Click here to download the 2012 Giants 300 Survey


Please email your completed survey to bdcGiants300@sgcmail.com. Only an Excel document will be accepted. DO NOT SEND in any other format (no PDFs, please). 

If you need any help or have a question, contact Rob Cassidy at 847.391.1040 or rcassidy@sgcmail.com or Tim Gregorski at 847.954.7941 or tgregorski@sgcmail.com.

Seeking cover photo for July issue!

We are looking for that absolutely stunning, dazzling, inspiring photo of your best project (completed in 2011 or 2012). Your great project could wind up on the cover of the July issue of BD+C. Send it right away to Tim Gregorski at tgregorski@sgcmail.com

The survey is also available for download directly below. BD+C

Tags

Related Stories

| Feb 29, 2012

Carvalho appointed Shawmut Safety Director

He has been a driving force behind multiple safety-orientated initiatives at Shawmut, including Safety Week, the creation of an online safety manual, and the implementation of a new safety reporting and tracking system. 

| Feb 29, 2012

Shepley Bulfinch selected to design new Children’s Hospital of Buffalo

The firm was selected because of their past experience in designing clinically complex facilities that emphasize patient- and family-centered care and operational efficiency as well as distinctive architectural forms for many other children's and women's hospitals.

| Feb 28, 2012

Roofing contractors recognized for workmanship

Sika Sarnafil announces Project of the Year winners; competition highlights visually stunning, energy efficient, and sustainable roofs.

| Feb 28, 2012

Waste Management awards companies for sustainable construction

This recognition, highlighting sustainable performances within the construction industry, looks to celebrate the builders who achieved important sustainability milestones in 2011, as determined by Waste Management’s online Diversion and Recycling Tracking Tool.

| Feb 28, 2012

Salem State University Library & Learning Commons topped off

When it opens to students in the fall of 2013, the $60 million facility will offer new archival space; circulation and reference areas; collections; reading spaces; study rooms; instruction labs and a Dean’s suite. 

| Feb 28, 2012

More than 1,000 have earned EDAC certification since 2009

Milestone achieved as evidence-based design becomes a top 2012 strategy for healthcare organizations.

| Feb 28, 2012

McCarthy completes second phase of San Diego’s Scripps Hospital

Representing the second phase of a four-phased, $41.3 million expansion and remodeling project, the new addition doubles the size of the existing emergency department and trauma center to encompass a combined 27,000 square feet of space. 

| Feb 28, 2012

LUMEnergi names Weinbaum president and CEO

Weinbaum’s experience spans communications, nanotechnology, electronics components, consumer products, semiconductors, software, wireless and lighting.

| Feb 28, 2012

Griffin Electric completes Medical University of South Carolina project

The 210,000-sf complex is comprised of two buildings, and houses research, teaching and office areas, plus conference spaces for the University.

| Feb 27, 2012

Consigli complete first building for Bigelow Ocean Sciences Campus

Designed by WBRC Architects Engineers in association with Perkins + Will.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021