Submissions are due April 13, 2012. Results will be published in the July 2012 issue of Building Design+Construction and additional coverage will be available online at www.bdcnetwork.com
If you're just getting started, please use this slightly updated version of the Giants 300 survey. Please note the new questions about "Industrial Buildings" in 4B and "NEW Construction vs. RECONSTRUCTION" in 5F.
Explanation of "public sector tab" in Giants 300 survey
Important point: how to allocate revenues in the "Public Sector" tab and the "Building Type" tab. If, for example, your firm did an office building for the State of New York, you would put the revenues your firm earned for that project in "Office Buildings" Building Type Tab 4B AND you would also count that same revenue in "State Government" in Public Sector Tab 4C.
Click here to download the 2012 Giants 300 Survey
Please email your completed survey to bdcGiants300@sgcmail.com. Only an Excel document will be accepted. DO NOT SEND in any other format (no PDFs, please).
If you need any help or have a question, contact Rob Cassidy at 847.391.1040 or rcassidy@sgcmail.com or Tim Gregorski at 847.954.7941 or tgregorski@sgcmail.com.
Seeking cover photo for July issue!
We are looking for that absolutely stunning, dazzling, inspiring photo of your best project (completed in 2011 or 2012). Your great project could wind up on the cover of the July issue of BD+C. Send it right away to Tim Gregorski at tgregorski@sgcmail.com.
The survey is also available for download directly below. BD+C
Related Stories
| Mar 1, 2012
Reconstruction Awards: Reinvesting in a neighborhood’s future
The reconstruction of a near-century-old derelict public works facility in Minneapolis earns LEED Platinum—and the hearts and minds of the neighboring community.
| Mar 1, 2012
7 keys to ‘Highest value, lowest cost’ for healthcare construction
The healthcare design and construction picture has been muddied by uncertainty over the new healthcare law. Hospital systems are in a bind, not knowing what levels of reimbursement to expect. Building Teams serving this sector will have to work even harder to meet growing client demands.
| Mar 1, 2012
Cornell shortlists six architectural firms for first building on tech campus
Each of the firms will be asked to assemble a team of consultants and prepare for an interview to discuss their team’s capabilities to successfully design the university’s project.
| Mar 1, 2012
Aragon Construction completes 67,000-sf build-out in NYC
Aragon constructed the space in partnership with Milo Kleinberg Design Associates, (MKDA) and the Craven Corp. as the owner’s representative.
| Mar 1, 2012
Bomel completes design-build parking complex at U.C. San Diego
The $24-million facility, which fits into a canyon setting on the university’s East Campus, includes 1,200 stalls in two adjoining garages and a soccer field on a top level.
| Mar 1, 2012
Eidco Construction bolsters Chicago office
Eldco hires Peterson and Vivoda as senior project managers.
| Mar 1, 2012
Reconstruction of L.A.’s Dunbar Hotel underway
Withee Malcolm Architects’ designs for the project include the complete renovation of the Dunbar Hotel and the Somerville Apartments I and II.
| Feb 29, 2012
C.W. Driver opens new office, appoints Castillo regional SVP
Castillo will oversee projects with new and existing clients in northern California within the areas of education, healthcare/biomedical, public sector, military contracting, entertainment, retail, corporate and hospitality.
| Feb 29, 2012
Report says BIPV glass market to reach $6.4 billion by 2016
The report analyzes the opportunities for BIPV glass products using c-Si, thin-film and OPV/DSC materials and provides eight-year forecasts in terms of MW and square footage shipped as well as forecasts of revenue generated.
| Feb 29, 2012
Construction begins on Keller Army Community Hospital addition
The 51,000 square foot addition will become the home for optometry, ophthalmology, physical therapy, and orthopedics clinics, as well as provide TRICARE office space.