Submissions are due April 13, 2012. Results will be published in the July 2012 issue of Building Design+Construction and additional coverage will be available online at www.bdcnetwork.com
If you're just getting started, please use this slightly updated version of the Giants 300 survey. Please note the new questions about "Industrial Buildings" in 4B and "NEW Construction vs. RECONSTRUCTION" in 5F.
Explanation of "public sector tab" in Giants 300 survey
Important point: how to allocate revenues in the "Public Sector" tab and the "Building Type" tab. If, for example, your firm did an office building for the State of New York, you would put the revenues your firm earned for that project in "Office Buildings" Building Type Tab 4B AND you would also count that same revenue in "State Government" in Public Sector Tab 4C.
Click here to download the 2012 Giants 300 Survey
Please email your completed survey to bdcGiants300@sgcmail.com. Only an Excel document will be accepted. DO NOT SEND in any other format (no PDFs, please).
If you need any help or have a question, contact Rob Cassidy at 847.391.1040 or rcassidy@sgcmail.com or Tim Gregorski at 847.954.7941 or tgregorski@sgcmail.com.
Seeking cover photo for July issue!
We are looking for that absolutely stunning, dazzling, inspiring photo of your best project (completed in 2011 or 2012). Your great project could wind up on the cover of the July issue of BD+C. Send it right away to Tim Gregorski at tgregorski@sgcmail.com.
The survey is also available for download directly below. BD+C
Related Stories
| Apr 6, 2012
Batson-Cook breaks ground on hotel adjacent to Infantry Museum & Fort Benning
The four-story, 65,000-ft property will feature 102 hotel rooms, including 14 studio suites.
| Apr 6, 2012
Perkins Eastman unveils Qatar mixed-use sports complex
Home stadium for Lekhwiya Club a vibrant addition to Doha’s architectural identity.
| Apr 5, 2012
5 tips for a successful door and window retrofit
An exclusive tip sheet to help the Building Team manage door and window retrofits successfully.
| Apr 4, 2012
Educational facilities see long-term benefits of fiber cement cladding
Illumination panels made for a trouble-free, quick installation at a cost-effective price.
| Apr 4, 2012
HDS designs Mount Auburn Hospital’s new healthcare center in Waltham, Mass.
HDS Architecture provided design services for all the Mount Auburn Healthcare suites including coordination of HVAC and FP engineering.
| Apr 4, 2012
Bald joins the Harmon glazing team
Bald has 13 years of experience in the glazing industry, coming to Harmon from Trainor where he was the regional manager of the Mid-Atlantic region.
| Apr 4, 2012
JCJ Architecture designs New York City's first casino
Aqueduct Racetrack complex transformed into modern entertainment destination.
| Apr 4, 2012
San Antonio animal hospital earns LEED Platinum certification
Middleman Construction Company builds the city?s first commercial building to earn certification.
| Apr 4, 2012
Hason joins RNL’s as MENA regional director
Hason specializes in planning and urban design, hospitality, office, corporate headquarters and transportation structures, as well as, higher education and museum facilities.
| Apr 3, 2012
Product Solutions
Two new PV systems; a lighter shelf; and fire alarm/emergency communication system.