Submissions are due April 13, 2012. Results will be published in the July 2012 issue of Building Design+Construction and additional coverage will be available online at www.bdcnetwork.com
If you're just getting started, please use this slightly updated version of the Giants 300 survey. Please note the new questions about "Industrial Buildings" in 4B and "NEW Construction vs. RECONSTRUCTION" in 5F.
Explanation of "public sector tab" in Giants 300 survey
Important point: how to allocate revenues in the "Public Sector" tab and the "Building Type" tab. If, for example, your firm did an office building for the State of New York, you would put the revenues your firm earned for that project in "Office Buildings" Building Type Tab 4B AND you would also count that same revenue in "State Government" in Public Sector Tab 4C.
Click here to download the 2012 Giants 300 Survey
Please email your completed survey to bdcGiants300@sgcmail.com. Only an Excel document will be accepted. DO NOT SEND in any other format (no PDFs, please).
If you need any help or have a question, contact Rob Cassidy at 847.391.1040 or rcassidy@sgcmail.com or Tim Gregorski at 847.954.7941 or tgregorski@sgcmail.com.
Seeking cover photo for July issue!
We are looking for that absolutely stunning, dazzling, inspiring photo of your best project (completed in 2011 or 2012). Your great project could wind up on the cover of the July issue of BD+C. Send it right away to Tim Gregorski at tgregorski@sgcmail.com.
The survey is also available for download directly below. BD+C
Related Stories
| Jun 13, 2013
Health Product Declaration Collaborative names Knott as Executive Director
John L. Knott Jr. has been named as the Health Product Declaration Collaborative’s (www.hpdcollaborative.org) first Executive Director following a national search. The Health Product Declaration Collaborative (HPDC) is a customer-led standards-setting organization committed to the continuous improvement of the building industry’s environmental and health performance, through transparency and innovation in the building product supply chain.
| Jun 13, 2013
AIA partners with industry groups to launch $30,000 'Designing Recovery' design competition
The program will award a total of $30,000 to three winning designs, divided equally between three locations: Joplin, Mo., New Orleans, and New York.
| Jun 12, 2013
More than 90% of New York City schools have code violations
More than 90% of New York City schools have at least one outstanding building code violation. Loose wires, stuck doors and inadequate ventilation are just some of the problems.
| Jun 12, 2013
5 building projects that put the 'team' in teamwork
The winners of the 2013 Building Team Awards show that great buildings cannot be built without the successful collaboration of the Building Team.
| Jun 12, 2013
Sacred synergy achieves goals for religious education [2013 Building Team Award winner]
A renovation/addition project at Columbia Theological Seminary unites a historic residence hall with a modern classroom facility.
| Jun 12, 2013
‘Talking’ Braille maps help the visual impaired
Talking pen technology, combined with tactile maps, allows blind people to more easily make their way around BART stations in the Bay Area.
| Jun 11, 2013
Music/dance building supports sweet harmony [2013 Building Team Award winner]
A LEED Gold project enhances a busy Chicago neighborhood, meeting ambitious criteria for acoustical design and adaptability.
| Jun 11, 2013
Vertical urban campus fills a tall order [2013 Building Team Award winner]
Roosevelt University builds a 32-story tower to satisfy students’ needs for housing, instruction, and recreation.
| Jun 11, 2013
Building a better box: High-bay lab aims for net-zero [2013 Building Team Award winner]
Building Team cooperation and expertise help Georgia Tech create a LEED Platinum building for energy science.
| Jun 11, 2013
Finnish elevator technology could facilitate supertall building design
KONE Corporation has announced a new elevator technology that could make it possible for supertall buildings to reach new heights by eliminating several problems of existing elevator technology. The firm's new UltraRope hoisting system uses a rope with a carbon-fiber core and high-friction coating, rather than conventional steel rope.