Wynn Resorts is preparing to convert a 130-acre golf course in Las Vegas into Paradise Park, a $1.5 billion development with a 20-acre lagoon at its core. According to CNBC, the park was originally disclosed last year, but it wasn’t until just recently the company’s board approved the project.
The lagoon will include a white sand waterfront and host water sports during the day and fireworks shows at night. A boardwalk is planned for the lagoon, as well. The lagoon and beach area, which includes the boardwalk, retail, and restaurants, will be part of the first phase of the project. This phase should be completed no later than 2020 and is expected to drive other, following amenities.
Subsequent phases, of which there has been no word as to how many there will be, may include convention space, a new residential/hotel tower, and entertainment attractions. The tower may hold as many as “a couple thousand rooms,” Wynn Resorts Chairman and CEO Steve Wynn said during the company’s first-quarter earnings call.
Wynn’s vision is for Paradise Park to be a family destination with the lagoon providing a daily Disneyland-type show, but on a larger scale.
Paradise Park will sit adjacent to the Wynn Las Vegas resort complex just off the Las Vegas Strip. A media event is expected within the next few months to provide more details about the project.
Related Stories
| Feb 6, 2012
FMI releases 2012 Construction Productivity Report
Downsizing has resulted in retaining the most experienced and best-trained personnel who are the most capable of working more efficiently and harder.
| Feb 2, 2012
Shawmut Design and Construction launches sports venues division
Expansion caps year of growth for Shawmut.
| Jan 24, 2012
U of M installs new lighting at Crisler Player Development Center
Energy efficient lighting installed at PDC reduce costs and improves player performance.
| Jan 3, 2012
The Value of Historic Paint Investigations
An expert conservator provides a three-step approach to determining a historic building’s “period of significance”—and how to restore its painted surfaces to the correct patterns and colors.
| Dec 27, 2011
Nova completes $60M Clearwater Conference Center
Comprising an entire city block, the 450,000 sq. ft. facility features over 400 meeting rooms, six theaters, a full-service health spa, complete with an indoor running track, and a commercial kitchen that can efficiently accommodate over 1,000 diners
| Dec 27, 2011
BD+C's Under 40 Leadership Summit update
The two-day Under 40 Leadership Summit continued with a Leadership Style interactive presentation; Great Solutions presentations from Under 40 attendees; the Owner’s Perspective panel discussion; and the Blue Ocean Strategy presentation.
| Dec 14, 2011
Tyler Junior College and Sika Sarnafil team up to save energy
Tyler Junior College wanted a roofing system that wouldn’t need any attention for a long time.
| Dec 5, 2011
Summit Design+Build begins renovation of Chicago’s Esquire Theatre
The 33,000 square foot building will undergo an extensive structural remodel and core & shell build-out changing the building’s use from a movie theater to a high-end retail center.
| Nov 9, 2011
Lincoln Center Pavilion wins national architecture and engineering award
The project team members include owner Lincoln Center for the Performing Arts, New York; design architect and interior designer of the restaurant, Diller Scofidio + Renfro, New York; executive architect, FXFOWLE, New York; and architect and interior designer of the film center, Rockwell Group, New York; structural engineer Arup (AISC Member), New York; and general contractor Turner Construction Company (AISC Member), New York.
| Nov 9, 2011
Sika Sarnafil Roof Recycling Program recognized by Society of Plastics Engineers
Program leads the industry in recovering and recycling roofing membrane into new roofing products.