flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

158-unit multifamily complex set to begin construction in D.C.’s Logan Circle

Multifamily Housing

158-unit multifamily complex set to begin construction in D.C.’s Logan Circle

Hickok Cole is the project architect.


By David Malone, Managing Editor | July 28, 2021
15th and S exterior rendering
15th and S exterior rendering

A new 158-unit, 114,878-sf multifamily development is set to begin construction in Washington, D.C.’s Logan Circle submarket.

The five-story project is located at the intersection of 15th Street NW and S Street NW, less than a half mile from the U Street Metro Station. The project is also only one block away from 14th Street NW, the heart of nightlife, restaurants, and entertainment for the area’s young professionals.

 

15th and S rendering

 

The project will sit on a 44,595-sf parcel of land that is currently a parking lot for The House of the Temple. The land includes a historic carriage house. Key elements of the new complex include a fitness facility, a business center, an entertainment space with hosting capabilities, a rooftop recreation areas with grilling stations and a pool, a 10,000-sf backyard garden, an 108 below-grade parking spaces.

Hickok Cole is the project architect and Harvey-Cleary Builders is the general contractor. The project developer is Perseus TDC. The project is slated for completion in spring 2023.

Related Stories

Coronavirus | May 26, 2020

Multifamily developers report mounting delays in permitting and starts due to coronavirus pandemic

More than half (53%) of multifamily developer respondents reported construction delays in the jurisdictions where they operate, according to the third edition of the National Multifamily Housing Council (NMHC) COVID-19 Construction Survey.

Multifamily Housing | May 8, 2020

Nashville's newest residential tower will rise 416 feet

Goettsch Partners is designing the project.  

Multifamily Housing | May 8, 2020

'Lakehouse' is the first multifamily project in Colorado to receive WELL Precertification

Stantec and Muñoz + Albin are the project's architects.  

Senior Living Design | May 5, 2020

5 memory care communities with a strong sense of mission

Communities in California, Colorado, Florida, Maryland, and Virginia display excellence in memory care facility development, design, and construction.

Multifamily Housing | Apr 23, 2020

Tankless water heaters: 12 things to know about these energy savers for multifamily housing

Twelve factors to consider in using tankless water heaters in multifamily housing.

Multifamily Housing | Apr 20, 2020

Multifamily market flattens as construction proposal activity sinks

Multifamily has consistently been one of the strongest performers among 58 submarkets measured in PSMJ Resources’ quarterly survey.

Coronavirus | Apr 15, 2020

COVID-19 alert: 93% of renters in professionally managed multifamily housing paid some or all of their rent, says NMHC

In its second survey of 11.5 million units of professionally managed apartment units across the country, the National Multifamily Housing Council (NMHC) found that 84% of apartment households made a full or partial rent payment by April 12, up 15 percentage points from April 5.

Multifamily Housing | Apr 15, 2020

Related Group picks Stantec to design and engineer Manor Miramar residences in Florida

Related Group picks Stantec to design and engineer Manor Miramar residences in Florida.

Coronavirus | Apr 5, 2020

COVID-19: Most multifamily contractors experiencing delays in projects due to coronavirus pandemic

The NMHC Construction Survey is intended to gauge the magnitude of the disruption caused by the COVID-19 outbreak on multifamily construction.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021