flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

15 stellar historic preservation, adaptive reuse, and renovation projects

15 stellar historic preservation, adaptive reuse, and renovation projects

Meet the winners of Building Design+Construction's 2013 Reconstruction Awards


By BD+C Editor | October 30, 2013
Historic preservation adaptive reuse project: 510 Fifth Reno
Historic preservation adaptive reuse project: 510 Fifth Reno

The winners of the 2013 Reconstruction Awards showcase the best work of distinguished Building Teams, encompassing historic preservation, adaptive reuse, and renovations and additions.

 

 

 

 

 

Platinum Awards

 

Nation's first glass curtain wall exterior restored in San Francisco

The Hallidie Building's glass-and-steel skin is generally recognized as the forerunner of today’s curtain wall facilities. Read the story.
 
 
 
 

 

High-rise Art Deco courthouse gets a makeover in Amarillo, Texas

Recognized as one of the most significant Art Deco courthouses in Texas, the Potter County Courthouse is modernized and restored to its 1930s aesthetic. Read the story.
 
 
 
 

 

Toronto Maple Leafs arena converted to university recreation facility

Using steel reinforcement and massive box trusses, a Building Team methodically inserts four new floors in the landmark arena while preserving and restoring its historic exterior. Read the story.
 
 
 

 

Gold Awards

Cass Gilbert's landmark St. Louis Central Library gets a reboot

A $70 million project returns large sections of the building to their original Beaux Arts beauty, while modernizing the spaces to make them more inviting and useful for today’s patrons. Read the story.
 
 
 
 

From power plant to office: Ambler Boiler House conversion

The shell of a 19th-century industrial plant is converted into three levels of modern office space. Read the story.
 
 
 
 
 

SOM gets second crack at iconic modernist structure in New York

More than 50 years after SOM completed the Manufacturers Hanover Trust building, the firm is asked to restore and modernize the space. Read the story.
 
 
 
 
 

Statue of Liberty update brings patrons closer to the action

While past renovation and restoration work on Liberty Island received more fanfare, the latest update arguably has had a greater impact on the three million people that visit the monument each year. Read the story.
 
 
 

 

Silver Awards

 

Manhattan's landmark Marble Collegiate Church modernized

Marble Collegiate Church, built in 1854 on a dirt road, is now surrounded by a densely populated Manhattan neighborhood. Gaining national recognition during the 52-year tenure of Norman Vincent Peale, the Romanesque Revival landmark still serves more than 2,200 congregants. Read the story.
 
 
 
 
 

Everyman Theatre, Baltimore, Md.

The Baltimore structure that opened as the Empire Theatre in 1911 has seen stints as a vaudeville house, burlesque theater, cinema, bingo parlor, boxing venue, adult-movie theater, and parking garage. In 1990, the dilapidated building was abandoned. Everyman Theatre—a professional repertory company—took possession 16 years later through a $1 transfer from the Bank of America and the Harold A. Dawson Trust. Read the story. (TO COME)
 
 
 
 
 

Conrad B. Duberstein U.S. Bankruptcy Courthouse, Brooklyn, N.Y.

The narrative of this exterior restoration centers on the sheer scale of the project. The six-year, $61.7 million effort involved meticulously inspecting, cataloging, and restoring more than 75,000 sf of granite and terra cotta cladding. Read the story. (TO COME)
 
 
 
 
 

Thomas P. O’Neill Jr. Federal Building, Washington, D.C.

The District of Columbia, famed for neoclassical landmarks, also has its share of modernist behemoths. The Thomas P. O’Neill Jr. Federal Building is typical—more than half a million square feet in a nine-story structure occupying most of a city block. Built in 1965 for the FDA, the laboratory facility was recently transformed into green, Class A office space for several federal tenants, incorporating some bold interior changes and a thoughtful exterior upgrade. Read the story. (TO COME)
 
 
 
 
 

Paramount Theatre, Cedar Rapids, Iowa

In Stephen Sondheim’s musical “Follies,” an aging chorine sings of life’s ups and downs, punctuated by the refrain “I’m still here.” The phrase would be a fitting theme for the Paramount Theatre of Cedar Rapids, Iowa—a beloved building that has survived an entertainment revolution, economic upheavals, and a natural disaster. Read the story. (TO COME)
 
 
 

 

Bronze Awards

 

Oregon Department of Transportation, Salem, Ore.

Oregon’s Department of Transportation occupies one of the last state government facilities in Salem to receive an energy and seismic retrofit. The 1951 structure has been transformed with a reconstruction that significantly improved efficiency and occupant comfort. Read the story. (TO COME)
 
 
 
 
 

Wrigley Building, Chicago

The Wrigley Building, erected in two phases in the early 1920s, has always been a jewel of Chicago’s busy Michigan Avenue. The building’s two towers are connected by a 14th-floor bridge, but few passersby would know that the original design intent was to have an open plaza between the towers. Read the story. (TO COME)
 
 
 

 

Special Recognition

 

‘Daylighting’ the Saw Mill River at Larkin Plaza, Yonkers, N.Y.

A “daylighting” plan uncovered the Saw Mill River and made it the centerpiece of a new public park, restoring a long-absent feature of downtown Yonkers, N.Y. Read the story. (TO COME)
 
 
 

 

2013 Reconstruction Awards Judges

 
 
Judges for Building Design+Construction’s 30th Annual Reconstruction Awards (left to right): Bonnie McDonald, K. Nam Shiu, Rick Juneau, Daniel Doyle, Walker Johnson, Stephen Martinez, Gary Keclik. Not pictured: Martha Bell
 
 
HONORARY CHAIR
Walker C. Johnson, FAIA
Principal
Johnson Lasky Architects
Chicago, Ill.
 
DISTINGUISHED MEMBERS
Martha Bell, FAIA, LEED AP
Principal
Tilton, Kelly + Bell
Chicago, Ill.
 
Daniel L. Doyle, PE, LEED AP O+M
President
Grumman/Butkus Associates
Evanston, Ill.
 
Rick Juneau, LEED AP
President, Residential & Restoration
Bulley & Andrews
Chicago, Ill.
Gary B. Keclik, AIA, CSI, GGA, LEED AP
Principal Architect
Keclik Associates
Hoffman Estates, Ill.
 
Stephen L. Martinez, LEED AP
Senior VP,  Project Management & Development Services
Transwestern
Chicago, Ill.
 
Bonnie McDonald
President
Landmarks Illinois
Chicago, Ill.
 
K. Nam Shiu, SE, PE
Senior VP, Director of Restoration Services
Walker Restoration Consultants
Chicago, Ill.

Related Stories

| May 24, 2012

Stellar completes St. Mark’s Episcopal Church and Day School renovation and expansion

The project united the school campus and church campus including a 1,200-sf chapel expansion, a new 10,000-sf commons building, 7,400-sf of new covered walkways, and a drop-off pavilion.

| May 23, 2012

MBI Modular Construction Campus Launched on BDCUniversity.com

White Papers, Case Studies, Industry Annual Reports, published articles and more are offered.

| May 23, 2012

Gifford joins Perkins Eastman as principal

Design and planning expertise in science, technology, education, and healthcare.

| May 23, 2012

McRitchie joins McCarthy Building as VP, commercial services in southern California

McRitchie brings more than 18 years of experience in the California construction marketplace.

| May 23, 2012

Arizona Army National Guard Readiness Center awarded LEED Silver

LEED certification of the AZ ARNG Readiness Center was based on a number of green design and construction features SAIC implemented that positively impacted the project and the broader community.

| May 23, 2012

New hospitals invest in data centers to manage growth in patient info

Silver Cross became one of the first hospitals to install patient tracking software so families know where a patient is at all times. New communication equipment supports wireless voice and data networks throughout the hospital, providing access to patients and their families while freeing clinicians to use phones and computers where needed instead of based on location.

| May 23, 2012

Summit Design+Build selected as GC for Chicago restaurant

Little Goat will truly be a multifunctional space.  Construction plans include stripping the 10,000 sq. ft. building down to the bare structure everywhere, the installation of a new custom elevator and adding square footage at the second floor with an addition.

| May 22, 2012

Batson-Cook names Partin VP of Business Development

Partin joins general contractor from Georgia Hospital Association.

| May 22, 2012

Casaccio Architects and GYA Architects join to form Casaccio Yu Architects

Architects Lee A. Casaccio, AIA, LEED AP, and George Yu, AIA, share leadership of the new firm.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021