flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

12-story mixed-use development opens in Washington, D.C.

Mixed-Use

12-story mixed-use development opens in Washington, D.C.

Cooper Carry designed the project.


By David Malone, Associate Editor | June 3, 2019
Columbia Place building in Washington, D.C. at night

All photos courtesy Cooper Carry

Columbia Place, a 12-story mixed-use development in Washington, D.C. features hospitality, residential, and retail offerings in the Shaw Historic District. The recently completed adaptive reuse project incorporates eight historic buildings, one of which is a Civil War-era home, into the design.

The $230 million, Cooper Carry-designed project includes a dual-branded, 4-star hotel with two levels of underground parking and more than 200 apartments. The hotel component comprises a 357-room Courtyard by Marriott hotel and a 147-room Residence Inn. The apartment component, dubbed The Lurgan, includes 203 units available in studio, one-, and two-bedroom layouts. Additionally, the development includes 3,000 sf of ground-floor retail, 4,000 sf of rooftop amenities, and 10,000 sf of shared meeting space.

 

See Also: Grilled to order: The art of outdoor kitchens

 

The Civil War-era home, a three-story townhome, was moved from its original location and incorporated into the project within the dual-bran hotel. The existing Lurgan building, as well as seven other historic buildings, were restored and reused for street-level retail to enhance the residential experience and preserve the area’s historic character.

 

Columbia Place building in Washington, D.C.

 

Columbia Place building in Washington, D.C.

 

Columbia Place building in Washington, D.C.

 

Columbia Place building in Washington, D.C.

 

Columbia Place building in Washington, D.C.

 

Columbia Place building in Washington, D.C.

Tags

Related Stories

Mixed-Use | Oct 2, 2020

Zaha Hadid Architects unveils 2 Murray Road in Hong Kong

The project reinterprets the structural forms and layering of a Bauhinia bud about to blossom.

Reconstruction & Renovation | Sep 30, 2020

SOM reimagines former Cook County Hospital into mixed-use destination

The project is the first phase of a proposed $1 billion redevelopment plan for the area in Chicago.

Mixed-Use | Sep 23, 2020

SOM-designed waterfront neighborhood will include 1,045-foot-tall tower

The project will focus on harnessing the sea and the sun to create a low-carbon waterfront community.

Mixed-Use | Sep 7, 2020

Google proposes 40-acre redevelopment that includes nearly 2,000 housing units

Lendlease will manage the design and construction, as a partner in a multi-development deal struck last year between the two companies.

Mixed-Use | Sep 3, 2020

10 Design will redevelop the Nanjing Dajiaochang Airport

The old military airport will become a contemporary mixed-use destination.

Mixed-Use | Aug 17, 2020

New Sydney towers will have the world’s first AI-driven facade system

SOM and Fender Katsalidis are designing the project.

Mixed-Use | Aug 4, 2020

San Jose’s new tallest building tops out

Steinberg Hart designed the project.

Mixed-Use | Jul 27, 2020

$92 million reconstruction of St. Petersburg Municipal Pier completes

Rogers Partners, ASD | SKY, and landscape architect Ken Smith Workshop designed the project.

Mixed-Use | Jul 22, 2020

Skanska selects Pickard Chilton to design innovative office tower in Bellevue, Wash.

The 800,000-gsf mixed-use project is located at 10660 NE 8th Street.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021

Â