flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

At 11.8 million-sf, LG Science Park is the largest new corporate research campus in the world

Office Buildings

At 11.8 million-sf, LG Science Park is the largest new corporate research campus in the world

The project is currently 75% complete and on schedule to open in 2018.


By David Malone, Associate Editor | June 12, 2017

Image courtesy of HOK

Seoul’s Magok District is about to become home to the largest new corporate research campus in the world. LG Science Park, designed by HOK for LG Group, will accommodate LG researchers from disciplines including electronics, chemistry, nanotechnology, display, fabrication, life sciences, and new materials across its 11.8 million sf.

The campus will house 19,000 LG employees from 10 affiliates under one roof at its location next to the Han River. The number of employees working at the campus could eventually grow as large as 21,000.

HOK designed the overall campus masterplan and architecture, including 10 laboratory and office buildings that total more than 8 million sf. These buildings are connected via an underground amenities and service floor and subterranean parking levels. At ground level, publicly accessible gardens and parks will link the buildings. Additionally, the campus will face a large new public park.

 

Image courtesy of HOK.

 

The ground level will also be home to several restaurants that can accommodate up to 6,100 people. The dining areas can also double as informal collaboration hubs. Scientific collaboration will also be emphasized via flexible spaces, informal meeting areas, seminar suites, and bridges that link researchers from different disciplines.

The Integrated Support Centre (ISC) will house a welcome center, multipurpose event hall, conference and seminar rooms, exhibition areas, and a VIP lounge at the center of the campus. Daycare facilities, sports and recreation areas, and convenience retail will also be included in the ISC.

 

Image courtesy of HOK.

 

Approximately 6,000 construction workers are currently employed on site. Progress is on schedule to meet the target grand opening in the summer of 2018.

 

Image courtesy of HOK.

 

Image courtesy of HOK.

Related Stories

| Oct 12, 2010

From ‘Plain Box’ to Community Asset

The Mid-Ohio Foodbank helps provide 55,000 meals a day to the hungry. Who would guess that it was once a nondescript mattress factory?

| Oct 11, 2010

HGA wins 25-Year Award from AIA Minnesota

HGA Architects and Engineers won a 25-Year Award from AIA Minnesota for the Willow Lake Laboratory.

| Oct 8, 2010

Union Bank’S San Diego HQ awarded LEED Gold

Union Bank’s San Diego headquarters building located at 530 B Street has been awarded LEED Gold certification from the Green Building Certification Institute under the standards established by the U.S. Green Building Council.  Gold status was awarded to six buildings across the United States in the most recent certification and Union Bank’s San Diego headquarters building is one of only two in California.

| Oct 6, 2010

Windows Keep Green Goals in View

The DOE's National Renewable Energy Laboratory has almost 600 window openings, and yet it's targeting LEED Platinum, net-zero energy use, and 50% improvement over ASHRAE 90.1. How the window ‘problem’ is part of the solution.

| Sep 21, 2010

New BOMA-Kingsley Report Shows Compression in Utilities and Total Operating Expenses

A new report from the Building Owners and Managers Association (BOMA) International and Kingsley Associates shows that property professionals are trimming building operating expenses to stay competitive in today’s challenging marketplace. The report, which analyzes data from BOMA International’s 2010 Experience Exchange Report® (EER), revealed a $0.09 (1.1 percent) decrease in total operating expenses for U.S. private-sector buildings during 2009.

| Sep 13, 2010

Triple-LEED for Engineering Firm's HQ

With more than 250 LEED projects in the works, Enermodal Engineering is Canada's most prolific green building consulting firm. In 2007, with the firm outgrowing its home office in Kitchener, Ont., the decision was made go all out with a new green building. The goal: triple Platinum for New Construction, Commercial Interiors, and Existing Buildings: O&M.

| Aug 11, 2010

CTBUH changes height criteria; Burj Dubai height increases, others decrease

The Council on Tall Buildings and Urban Habitat (CTBUH)—the international body that arbitrates on tall building height and determines the title of “The World’s Tallest Building”—has announced a change to its height criteria, as a reflection of recent developments with several super-tall buildings.

boombox1
boombox2
native1

More In Category

Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021