flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

11 predictions for high-rise construction in 2015

11 predictions for high-rise construction in 2015

In its annual forecast, the Council on Tall Buildings and Urban Habitat predicts that 2015 will be the "Year of the Woodscraper," and that New York’s troubled B2 modular high-rise project will get back on track.


By BD+C Staff | December 17, 2014
 Shanghai Tower is on track to be completed by the end of 2015. Rendering courte
Shanghai Tower is on track to be completed by the end of 2015. Rendering courtesy Gensler

Tall buildings always draw attention, and in 2015 they're only getting bigger and better. The Council on Tall Buildings and Urban Habitat has published a list of its top predictions for skyscrapers in the coming year, noting milestones on individual projects, like the highly anticipated Kingdom Tower, and larger industry trends, such as the use of wood in high-rise construction.

From Moscow to Kuala Lumpur, it looks as if 2015 will hold some major highlights for the tall buildings industry. Here are CTBUH's predictions:

1. New York’s B2 Will Be Back
A legal scuffle between contractor Skanska and developer Forest City Ratner stalled this project in 2014, but it will likely be back on track early in 2015.

2. 2015: Year of the “Woodscraper”?
More than one wood-heavy skyscraper is under construction as we move into the new year, and the U.S. Department of Agriculture will reveal the winner of the $2 million Tall Wood Building Competition.

3. Dubai’s Burj 2020 to Get Under Way
The long-awaited Burj 2020 looks to begin construction in 2015, with shortlisted engineering teams being interviewed in late 2014.

4. Re-imagined Pinnacle Will Be Revealed
The London Pinnacle, only partway finished due to the recession, has been taken on by PLP Architects. Their plans for the project should be unveiled by spring of 2015.

5. Jeddah’s Kingdom Tower Completes 22nd Floor
CTBUH predicts that the tower will complete its 22nd floor by May, with construction currently running at 2.5 floors per month.

6. Las Vegas’ Harmon Hotel Will Finally Come Down
After years of frustration and speculation, the deconstruction of this ill-fated hotel began in 2014, and is on track for completion in 2015.

7. Ping An Finance Center Will Top Out
Shenzhen's Ping An Finance Center should reach its ultimate height by mid-2015. 

8. Moscow’s Federation Towers Will Be Completed
If this complex is finished in 2015, its Vostok Tower will be the tallest tower in Europe. 

9. Foundation Work for Kuala Lumpur’s KL118 Completed by Q3 2015
Developer KL118 has reported that the foundation for the tower will be laid by the end of 2015's third quarter. 

10. Shanghai Tower Will Be Completed
The tower and its glassed-in skygardens are set to open their doors by the end of 2015.

11. China Will Complete 13 Supertalls
Squarely ahead of any other country in this category, if China completes its scheduled 13 supertalls, it will be responsible for 57% of the world's supertall buildings in 2015.

 

Read CTBUH's "Watch Out for These Tall Happenings in 2015" report.

Related Stories

| Sep 24, 2014

5 business lessons from a 43-year Star veteran

Mary Ed Cain was supposed to be born a boy. That was the first time she surprised everyone. The second time came on a daily basis during her 43-year career at Star Building Systems. SPONSORED CONTENT

| Sep 24, 2014

Architecture billings see continued strength, led by institutional sector

On the heels of recording its strongest pace of growth since 2007, there continues to be an increasing level of demand for design services signaled in the latest Architecture Billings Index.

| Sep 24, 2014

Frank Gehry's first building in Latin America will host grand opening on Oct. 2

Gehry's design for the Biomuseo, or Museum of Biodiversity, draws inspiration from the site's natural and cultural surroundings, including local Panamaian tin roofs.

| Sep 23, 2014

Cedars-Sinai looks to streamline trauma care with first-of-its-kind OR360 simulation space

The breakthrough simulation center features moveable walls and a modular ceiling grid that allow doctors and military personnel to easily reconfigure the shape and size of the space.

| Sep 23, 2014

Third phase of New York’s High Line redevelopment opens

The $35 million Phase 3, known as High Line at the Rail Yards, broke ground September 20, 2012, and officially opened to the public on September 21.

| Sep 23, 2014

Cloud-shaped skyscraper complex wins Shenzhen Bay Super City design competition

Forget the cubist, clinical, glass and concrete jungle of today's financial districts. Shenzhen's new plan features a complex of cloud-shaped skyscrapers connected to one another with sloping bridges.

| Sep 23, 2014

Designing with Water: Report analyzes ways coastal cities can cope with flooding

The report contains 12 case studies of cities around the world that have applied advanced flood management techniques. 

| Sep 22, 2014

4 keys to effective post-occupancy evaluations

Perkins+Will's Janice Barnes covers the four steps that designers should take to create POEs that provide design direction and measure design effectiveness.

| Sep 22, 2014

NCARB overhauls Intern Development Program, cuts years off licensure process

The newly adopted changes will be implemented in two phases. The first will streamline the program by focusing on the IDP’s core requirements and removing its elective requirements. The second phase will condense the 17 current experience areas into six practice-based categories.

| Sep 22, 2014

Biloxi’s new Maritime and Seafood Industry Museum is like a ship in a bottle

Nine years after the Museum of Maritime and Seafood Industry in Biloxi, Miss., was damaged by Hurricane Katrina’s 30-foot tidal surge, the museum reopened its doors in a brand new, H3-designed building. 

boombox1
boombox2
native1

More In Category



Museums

The Tampa Museum of Art will soon undergo a $110 million expansion

In Tampa, Fla., the Tampa Museum of Art will soon undergo a 77,904-sf Centennial Expansion project. The museum plans to reach its $110 million fundraising goal by late 2024 or early 2025 and then break ground. Designed by Weiss/Manfredi, and with construction manager The Beck Group, the expansion will redefine the museum’s surrounding site.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021