flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

103 income-restricted residential units under construction in Downtown Denver

Multifamily Housing

103 income-restricted residential units under construction in Downtown Denver

KTGY is designing the project.


By David Malone, Associate Editor | April 12, 2021

Courtesy KTGY

Capitol Square Apartments, a six-story infill development designed by KTGY is set to bring 103 income-restricted units for a range of low- and moderate-income households near the Central Business District of Downtown Denver.

The development will take its design cues from the surrounding neighborhood. Its clean lines relate to the adjacent civic buildings and intentionally contrast to the highly detailed and ornate historic capitol building. The project’s amenities will include a leasing office, community space, and a fitness room at ground level as well as a landscaped outdoor terrace at the second-floor courtyard. Parking for 68 vehicles will be included at the ground and basement levels.

Of the 103 units, 73 will be one-bedroom units and 30 will be two-bedroom units. All apartments will be income-restricted exclusively for households earning between 40% and 80% of the area median income. The project’s U-shaped design opens up the interior units and courtyard to views of the Denver Art Museum and the mountains beyond.

The rental community is expected to be completed in 2022.

Related Stories

| Aug 1, 2012

C.W. Driver forms Driver URBAN

Driver URBAN specializes in the construction of multi-family apartments, mixed-use developments, affordable housing, student and senior housing, and hospitality projects.

| Jul 20, 2012

2012 Giants 300 Special Report

Ranking the leading firms in Architecture, Engineering, and Construction.

| Jul 19, 2012

Rental market pushing service, ‘community’

The Top 25 Giants 300 AEC firms in the Multifamily Sector keep four-legged tenants in mind.

| Jul 9, 2012

Modular Construction Delivers Model for New York Housing in Record Time

A 65-unit supportive housing facility in Brooklyn, N.Y., was completed in record time using modular construction with six stories set in just 12 days.

| Jul 9, 2012

Oakdale, Calif., Heritage Oaks Senior Apartments opens

New complex highlights senior preferences for amenities.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 31, 2012

2011 Reconstruction Awards Profile: Ka Makani Community Center

An abandoned historic structure gains a new life as the focal point of a legendary military district in Hawaii.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021