flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

1010 On-The-Rhine creates a walkable destination in Cincinnati

Mixed-Use

1010 On-The-Rhine creates a walkable destination in Cincinnati

GBBN designed the project.


By David Malone, Associate Editor | February 13, 2020
On the Rhine exterior

All photos: Brad Feinknopf

1010 On-the-Rhine, a 520-000-sf mixed-use project in Cincinnati, combines luxury apartments, a Kroger grocery and food hall, and parking on the site of a former surface parking lot in an underutilized part of the city.

The project is situated at the midpoint of Cincinnati’s streetcar route and connects two development zones at opposite ends of the city: historic Over-the-Rhine and the business district around Fountain Square. 

The southern half of the project resides in the Court Street Historic District, so GBBN needed the support of the Historic Conservation Board during the building’s design and construction. GBBN considered the context of the building in the larger surrounding community by designing the lower levels to match the scale of surrounding buildings to help integrate from the street view perspective. Additionally, window notches in groups of two and three replicate surrounding building patterns, but with a modern take.

 

Kroger outdoor terrace

 

The building ignites activity on three sides: a walk-up coffee window brings pedestrian traffic to Court Street; a daylight filled Kroger market on Walnut Street brings fresh and prepared foods to residents and people working downtown; and Kroger’s second floor food hall features an outdoor dining terrace overlooking Central Parkway. Views from both private residential balconies and from Kroger’s expansive street level windows further open up the project to the surrounding city.

 

See Also: 4 products for your next multifamily project

 

Both the apartments and the Kroger’s grocery store are now open.

 

On the Rhine Kroger's grocery store

Tags

Related Stories

Mixed-Use | Jan 18, 2017

Frank Gehry’s Grand Avenue Project in Los Angeles may finally be ready to break ground

The oft-delayed project was set to begin in 2007 but was halted due to the recession.

Mixed-Use | Dec 1, 2016

Amsterdam’s new sustainable mixed-use building embraces the idea of living on the water

The Sluishuis employs a unique shape that makes it appear different from every vantage point.

Mixed-Use | Dec 1, 2016

Initial work on mixed-use development, The Parks at Walter Reed, is underway

The D.C. development is the product of a partnership between Hines, Urban Atlantic, and Triden Development Group.

Multifamily Housing | Dec 1, 2016

One of Canada’s largest media companies dives into real estate development

Rogers moves forward on M City, a multi-building, multi-year project in a Toronto suburb.

Office Buildings | Nov 15, 2016

Under Armour unveils phase one of 50-acre Baltimore headquarters

The campus will be located in Baltimore’s $5.5 billion Port Covington redevelopment project.

Mixed-Use | Nov 10, 2016

Terraced mixed-use development planned for Shanghai’s urban city ring

The development will be highly accessible and provide ‘humanism’ to the area.

High-rise Construction | Nov 1, 2016

Winthrop Square will give rise to Boston’s second tallest building

The building will become the tallest residential tower in the city.

Mixed-Use | Oct 31, 2016

New Frank Gehry project on Sunset Boulevard moves forward with a few compromises

Among the compromises, the 8150 Sunset Blvd. project will see its tallest residential tower reduced by 56 feet.

Mixed-Use | Sep 27, 2016

10 Design wins competition to design huge mixed-use development in China

China Resources Land, New Fenghong Real Estate Development, and China Resources Trust have designated 50 billion yuan for the construction of the development.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021