flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

$1 billion master planned development in California clears key hurdle

$1 billion master planned development in California clears key hurdle

City council, developer agree on 500 affordable housing units


By Peter Fabris, Contributing Editor | July 1, 2014
La Entrada master-planned community in Coachella. Renderings: KTGY
La Entrada master-planned community in Coachella. Renderings: KTGY

Plans for a new section of the proposed $1 billion La Entrada master-planned community in Coachella, Calif., moved ahead after the developer and city council agreed that the plan would include 500 affordable housing units.

The 981-acre development in the Palm Springs area will include thousands of homes, schools, public parks, retail and office space, and maybe an athletic stadium.

The massive multi-use project is expected spur rapid growth in the city over the next two decades. Las Vegas-based New West Development expects to break ground in 2015.

Residents and officials had feared that the project would exclude low-income residents. The city council voted 5-0 in favor the proposed number of affordable housing units, though some community leaders said more of these residences should be earmarked for low-income residents given the city’s demographics.

In total, the plan calls for about 7,800 houses, condos and apartments, and a new highway interchange. The development will generate $1.1 billion in labor wages over 20 years, $3.4 billion in taxable sales revenue over 20 years, and 21,000 in jobs, according to the developer.

(http://www.desertsun.com/story/news/local/2014/06/12/coachella-city-council-la-entrada-housing-development/10360299/)

Related Stories

| Mar 8, 2012

Engineering innovation provides new option for meeting seismic codes in skyscrapers

Two University of Toronto engineers have developed “viscoelastic-energy-dissipating dampers” to replace many of the heavy concrete beams used in tall structures.

| Mar 8, 2012

CSI webinar on building code compliance March 22

A March 22 webinar will provide an overview of a 28-step process during the design of a building to ensure compliance with building codes.

| Mar 8, 2012

Federal silica dust rule caught in bureaucratic limbo

A federal rule meant to protect the lungs of workers has been caught in bureaucratic purgatory for more than a year.

| Mar 8, 2012

New LEED-EBOM rating has requirements for specific project types

Several key changes are proposed for the LEED-EBOM Rating System in 2012.

| Mar 8, 2012

Green buildings more resilient than conventionally built structures

A new study by the U.S. Green Building Council (USGBC) and the University of Michigan’s Taubman College of Architecture and Urban Planning suggests that structures built to green standards can advance building resiliency.

| Mar 1, 2012

LEED Platinum standard likely to mean net-zero energy by 2018

As LEED standards continue to rise, the top level, LEED Platinum, will likely mean net-zero energy construction by 2018.

| Mar 1, 2012

EPA beefs up stormwater discharge rule from construction projects

The U.S. Environmental Protection Agency (EPA) has now finalized its 2012 construction general permit (CGP) that authorizes stormwater discharges from construction projects that disturb one or more acres of land in the areas where EPA is the permitting authority.

| Mar 1, 2012

Regulators investigate structural failures during construction of two Ohio casinos

Regulators with the Occupational Safety & Health Administration and the city of Cincinnati are investigatingthe collapse of the second floor of Cincinnati's Horseshoe Casino as workers were pouring concrete.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021