flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

$1 billion Boston hospital project to include extensive disaster resiliency features

Codes and Standards

$1 billion Boston hospital project to include extensive disaster resiliency features

Mass. General expansion will be designed for four days of shelter in place.


By Peter Fabris, Contributing Editor | March 1, 2019

Courtesy Pixabay

Massachusetts General Hospital’s planned $1 billion expansion in Boston will include many features to cope with a natural disaster.

The goal is to create a structure where patients and staff could potentially shelter in place for four days. A hospital spokesperson cited lessons learned from Hurricanes Katrina and Sandy in creating a new wing to be able to withstand a disaster and function afterwards.

The site is close to the Charles River in an area that was once a marsh. Flood-proofing the 13-story building, which will have 456 single occupancy rooms, is a top priority. The facility could be a place of a refuge for the whole hospital.

The hospital is already fortifying existing buildings built in 1940 and 1969, including moving critical operations out of basements and putting special protective coatings on windows and doors.

Related Stories

Codes and Standards | Apr 11, 2017

2017 National Energy Codes Conference includes code boot camp, PNC Tower tour

The DOE-sponsored event will be held in Pittsburgh July 17-20.

Codes and Standards | Apr 10, 2017

Congressional hearing on skills gap includes look at construction industry

Strategies to boost ranks of construction workers include mentoring programs, increased safety measures, trade group support, and outreach to school counselors.

Codes and Standards | Apr 6, 2017

Product-specific EPDs seen as key aid to earning green building credits

The product-specific EPDs allow designers to more quickly earn a LEED v4 credit in the Materials & Resources category.

Codes and Standards | Apr 5, 2017

Updated AIA Disaster Assistance Handbook released with significant enhancements

Updates provide guidance on how design and construction pros and emergency managers can work together to prepare for and respond to disasters.

Codes and Standards | Apr 4, 2017

Global standards for indoor environmental monitoring under development

Systems and sensors guidelines will be aligned with major green standards.

Codes and Standards | Apr 3, 2017

New standard test method for static loading and impact on exterior shading released

The method provides a standard lab procedure evaluation of ice and snow loads and impacts.

Codes and Standards | Mar 30, 2017

WELL enters strategic partnership with developer of standards and assessment tools

GIGA’s RESET standard and data collection will be integrated into the WELL standard.

Codes and Standards | Mar 29, 2017

Climate-specific code changes target energy savings for tropical zones

Hawaii considers updated 2015 IECC tailored to its climate.

Codes and Standards | Mar 28, 2017

Safety concerns over wood-frame construction raised after Raleigh apartment fire

The unfinished building was destroyed in a five-alarm blaze.

Codes and Standards | Mar 27, 2017

Bills in Maryland Legislature would restrict use of wood in multifamily construction

American Wood Council and design and construction professionals are speaking out against the measure.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021