flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

A revitalized solar roof for San Francisco's Davies Symphony Hall

Sponsored Content Roofing

A revitalized solar roof for San Francisco's Davies Symphony Hall

White thermoplastic PVC roof system fits the bill for rooftop solar installation project at famed concert hall.


By Duro-Last Roofing | January 26, 2015
A revitalized solar roof for San Francisco's Davies Symphony Hall
A revitalized solar roof for San Francisco's Davies Symphony Hall

San Francisco has long been known as a center for culture and the performing arts. Showcased by its War Memorial Opera House, considered the last Beaux Arts building constructed in the United States, this legacy continued with construction of the adjoining Louise M. Davies Symphony Hall. Opened in 1980 and renovated in 1992, its modern design was a collaboration of architects and acoustical engineers working in concert to create an intimate environment to enhance the music of the San Francisco Symphony and the beauty of the structure itself.

Recently, the San Francisco Public Utilities Commission (SFPUC) determined that installing a photovoltaic (PV) solar system on Davies Symphony Hall would benefit the people of San Francisco. The SFPUC retained engineering consultant AEPC of San Ramon, Calif., to design the PV solar system for the 25,000-sf roof.

In addition to AEPC, the project team for the roof revitalization and PV solar system installation included Technical Roof Services (TRS) of Concord, Calif., and Fidelity Roof Company of Oakland, a Duro-Last® Certified Elite Contractor.

Moisture Issues Necessitated New Game Plan

Initially, the installation of a rooftop solar energy system seemed to be straightforward. However, upon further inspection, significant moisture issues were discovered in the underlying roof insulation, contributing to deteriorating conditions in the 14-year-old tar and gravel roof.

 


Davies Symphony Hall. Photo: Duro-Last Roofing

 

To further assess the roof’s condition, AEPC brought in Technical Roof Services (TRS) to conduct a more thorough evaluation. According to Venk Mani of AEPC, “We knew the roof had some leaks and wanted to correct any problem areas before the solar panels were installed. Our goal was to ensure that the roof could last the life of the solar array, or a minimum of 25 years.”

Presenting the Options to Ready Roof for PV Solar

Dregger presented the two available options to the SFPUC: either tear off the current roof and install a new one, or overlay the existing roof with a new membrane. After careful consideration, the SFPUC opted to re-cover the existing roof since replacing the old roof with a new one would take longer and interfere with the symphony’s rehearsal and performance schedule. After evaluating the available membrane alternatives, Dregger recommended a white 60 mil thick thermoplastic PVC roof system from Duro-Last Roofing.

Material Prefabrication Expedited Installation

Prefabrication was another advantage of the Duro-Last Roofing System. The membrane was prefabricated into 22 foot wide rolls, reducing the application time and on-site welding. In addition the penetration flashings, parapet wall membrane, membrane curbs, solar hold down boots and other related roof materials were all custom fabricated at the factory. This not only assured installation accuracy at changes in plane on the roof, such as projections, curbs, drains, perimeters and abutting walls, but of equal importance was Fidelity Roof Company’s ability to expedite the installation process and meet critical deadlines.

Location: San Francisco
Client: San Francisco Public Utilities Commission
Contractor: Fidelity Roof Company

To read the entire article, visit www.duro-last.com/marketing.

For more information:
Phone number: 800-248-0280
Fax number: 800.432.9331
E-mail: jbruzews@duro-last.com
Website: www.duro-last.com

Tags

Related Stories

75 Top Building Products | Dec 12, 2019

Top Building Envelope Products for 2019

Sto's beetle-inspired exterior coating and Dörken Systems' UV-resistant vapor-permeable barrier are among the 28 new building envelope products to make Building Design+Construction's 2019 101 Top Products report. 

Sponsored | Roofing | Oct 15, 2019

Should you repair or replace a roof? How to decide

There are a number of key considerations.

Sponsored | Roofing | Aug 30, 2019

A New Twist on TPO: Firestone UltraPly™ TPO Flex Adhered

The most flexible TPO on the market* makes complex jobs easier.

Sponsored | Roofing | Aug 17, 2018

Owens Corning® FOAMULAR® XPS solution brings game-changing solution to Mercedes-Benz Stadium

Bill Johnson, design principal for HOK, brought together experts from across the country to help realize the revolutionary engineering, design, and functionality envisioned for the $1.5 billion Mercedes-Benz Stadium project.

Sponsored | Roofing | Jul 24, 2018

Metal roofs take the residential market by storm

As metal roofing soars in popularity, so do the aesthetic options. 

Sponsored | Roofing | Jun 22, 2018

U.S. Coast Guard Headquarters - vegetative roof assembly, Washington, D.C.

A cross-functional team collaborated throughout the three-phased VRA construction.

Sponsored | Roofing | Mar 21, 2018

Renovation at Cincinnati Music Hall includes new automatic smoke vents for life safety

Workers tackled a 16-month, $143-million project at Cincinnati Music Hall, and finished the project last October.

Codes and Standards | Nov 16, 2017

White roofing isn’t always the best choice

Adverse effects include heat reflection onto nearby walls.

Green | Sep 12, 2017

Brooklyn’s Windsor Terrace Library gets a living roof

The roof was funded through a process that allows local residents to decide how City capital dollars are spent in their neighborhoods.

boombox1 - default
boombox2 -
native1 -

More In Category


Standards

Design guide offers details on rain loads and ponding on roofs

The American Institute of Steel Construction and the Steel Joist Institute recently released a comprehensive roof design guide addressing rain loads and ponding. Design Guide 40, Rain Loads and Ponding provides guidance for designing roof systems to avoid or resist water accumulation and any resulting instability.



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021