flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Editorial call for Multifamily Affordable Housing project case studies - no cost to submit!

Multifamily Housing

Editorial call for Multifamily Affordable Housing project case studies - no cost to submit!


By ROBERT CASSIDY, EXECUTIVE EDITOR | January 19, 2023
KFA Architecture designed PATH Metro Villas, a 186-unit complex in LA.

Los Angeles-based KFA designed PATH Metro Villas, a 186-unit complex serving veterans, seniors, and the formerly unhoused in LA's Rampart Village neighborhood. Also on the project for developer PATH Ventures: Englekirk Engineers (SE), KPFF Consulting Engineers (CE), ME Engineers (MEP), Irvine & Associates (land planner), and Walton Construction (GC). Photo: Jim Simmons Photography

Building Design+Construction will feature a roundup of "Multifamily Affordable Housing" projects on BDCnetwork.comThere is NO COST for submitting your project!

Please follow the guidelines below for your submission.

Deadline for Submission: Friday, February 3, 2023. 

Here’s what we need – please send as a Word document (preferred) or email text (not PDF):

1. PROJECT DESCRIPTION —project name, location, # of units, type of units (studio, 1BR, 2BR, loft, etc.), construction cost (or total cost). List Developer or Owner, key AEC firms involved (architect, MEP engineer, structure/civil engineer, landscape architect, builder/contractor, important specialty subcontractors – e.g., sustainability consultant, social services provider).

Note: Projects must have been completed in the last 18 months or so (please give approx. Occupancy Date or Construction Completion Date); also projects "in design" or under construction (send renderings for these). 

2. HIGH-QUALITY HIGH-RESOLUTION PHOTOS, 300 dpi, with short CAPTIONS (25-50 words) describing what’s going on in the photo (“925-sq. ft. fitness center at Aloha Apartments with yoga space,“ “Community garden at Aloha…”). For projects "in the works," submit high-resolution renderings with CAPTIONS and CREDITS.

We suggest 8-12 photos/renderings, a mix of Exteriors and Interiors, Horizontal and Vertical (if available), esp. interesting or unusual features, key amenities, important design elements ("wellness center," "community garden"), innovations, etc. 

We like photos with people in them – preferably real people, not actors. Casual, candid, not posed.

IMPORTANT: Please do not send photos via Dropbox. We do not have a Dropbox account. Please use another mechanism (WeTransfer, Google Drive, etc.) or send photos in email batches up to 20MB.

3. PHOTO CREDITS for all images – very important!

4. TELL US WHAT MAKES THE PROJECT SPECIAL Tell why BD+C readers would be interested in the project: health and wellness features, support services, innovations, special design or construction aspects, interesting financing mechanism, client target group (unhoused? families? seniors? veterans?), community involvement, sustainability, unusual obstacles you overcame, etc.

5. SUBMITTER'S CONTACT INFO – include your mobile phone (in case we have questions).

Please send materials to: Quinn Purcell, Managing Editor, BD+Cqpurcell@sgcmail.com.

Put "Affordable Housing 2023" in the SUBJECT line.

Questions? Email Rob Cassidy (rcassidy@sgcmail.com) or text at 773-220-3555.

Related Stories

| Aug 11, 2010

Bovis Lend Lease, Webcor among nation's largest multifamily contractors, according to BD+C's Giants 300 report

A ranking of the Top 50 Multifamily Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Looney Ricks Kiss Architects wins industry honors for mixed-use, multifamily, and residential designs

Looney Ricks Kiss Architects won four Aurora Awards for its architectural designs during the recent Southeast Building Conference in Orlando, including a Grand Aurora Award for a Mixed Use Multi Family community located in the West Village area of Dallas.

| Aug 11, 2010

Jacobs, Arup, AECOM top BD+C's ranking of the nation's 75 largest international design firms

A ranking of the Top 75 International Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

See what $3,000 a month will get you at Chicago’s Aqua Tower

Magellan Development Group has opened three display models for the rental portion of Chicago’s highly anticipated Aqua Tower, designed by Jeanne Gang. Lease rates range from $1,498 for a studio to $3,111 for a two-bedroom unit with lake views.

| Aug 11, 2010

Architecture Billings Index flat in May, according to AIA

After a slight decline in April, the Architecture Billings Index was up a tenth of a point to 42.9 in May. As a leading economic indicator of construction activity, the ABI reflects the approximate nine to twelve month lag time between architecture billings and construction spending. Any score above 50 indicates an increase in billings.

| Aug 11, 2010

Construction employment declined in 333 of 352 metro areas in June

Construction employment declined in all but 19 communities nationwide this June as compared to June-2008, according to a new analysis of metropolitan-area employment data released today by the Associated General Contractors of America.  The analysis shows that few places in America have been spared the widespread downturn in construction employment over the past year.

| Aug 11, 2010

Jacobs, Hensel Phelps among the nation's 50 largest design-build contractors

A ranking of the Top 50 Design-Build Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Arup, SOM top BD+C's ranking of the country's largest mixed-use design firms

A ranking of the Top 75 Mixed-Use Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

boombox1 - default
boombox2 -
native1 -

More In Category

Mass Timber

Charlotte's new multifamily mid-rise will feature exposed mass timber

Construction recently kicked off for Oxbow, a multifamily community in Charlotte’s The Mill District. The $97.8 million project, consisting of 389 rental units and 14,300 sf of commercial space, sits on 4.3 acres that formerly housed four commercial buildings. The street-level retail is designed for boutiques, coffee shops, and other neighborhood services.




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021